Off site, on track
|
| The role that off-site construction will play in shaping the future of the industry is becoming clearer, but we must take a strategic approach to ensure the benefits are fully realised, writes David Hawkes, ICE. |
Contents |
[edit] Introduction
The role that off-site construction will play in shaping the future of the industry is becoming clearer, but we must take a strategic approach to ensure the benefits are fully realised.
In November 2018, the UK government committed to increase the use of off-site construction on public projects. Building on the Construction Sector Deal commitments to improve productivity and adopt more digital technologies, the Infrastructure and Projects Authority set out its preferred approach to develop a 'Platform Approach to Design for Manufacture and Assembly' (P-DfMA), asking for further evidence on the proposal.
DfMA uses digital technology to design standardised components that are manufactured in factory conditions and then transported to site for assembly. A platform approach embedded across capital programmes means the same components used on a school can also be used in a hospital or railway station, reducing the reliance on unique elements.
The benefits of DfMA are diverse, ranging from lower costs, shorter programme times, higher quality products, improved safety, fewer carbon emissions and less waste. With so many advantages, particularly when used across repeatable assets, it’s clear to see why government views a P-DfMA approach as the way forward.
[edit] Building capacity
What is also clear is that the industry is not yet ready.
At a roundtable event held to help inform ICE’s response to the call for evidence, we heard that current approaches to DfMA are often bespoke and short-lived rather than planned across long-term programmes. Additionally, much of the good work being done is not shared.
The government’s mandate on the use of BIM Level 2 shows that the industry can implement major change, and it is likely that lessons can be learned from that process.
Capacity and resilience must first be built up, allowing the industry and supply chain to invest appropriately and implement the changes required. Departmental trailblazers can also help the industry to grow and provide a benchmark for improvement.
While there’s work for the industry to do, this is certainly not a one-sided relationship. Across government departments there are a multitude of technical specifications, regulations and restrictions. The government first needs to rationalise these to enable a consistent and streamlined set of standards and components to be developed that manufacturers, designers, engineers and constructors are happy to work with.
[edit] The role of Project 13
In a traditional delivery model, flexibility during the build process means components and more can be changed, or the order they are installed shifted around while on site. DfMA is completely different – the building or infrastructure must be assembled in the way it has been designed. This requires multiple aspects of a project to be considered, finalised and approved at an earlier stage, meaning a need for different delivery models, new skills and a complete shift in mentality and culture from the industry to implement it.
A model like Project 13 is therefore vital. This would support the proposed P-DfMA approach by providing sufficient scope for productivity and innovation so that suppliers can invest in modern methods of construction, create long-term relationships with closer collaboration, enable integration with advisors and suppliers, and lead to earlier, strategic engagement of the supply chain.
[edit] Patience is the key
There is another ingredient required to ensure the best possible outcome is achieved – patience. The IPA recognises that its proposed approach requires further research in the first instance, and the Institution of Civil Engineers (ICE) believes this stance should also extend throughout its implementation.
Such a major change will require investment and take time to fully form – prototypes will need to be developed and iterated, and lessons need to be learned from when things do go as planned. The system will not be at its most refined immediately, but by bringing in firms and their supply chains early and taking a focused approach, government and industry can move forward together and deliver the benefits that P-DfMA promises.
This article was written by David Hawkes, ICE Policy Manager. It first appeared on the ICE website in February 2019. Read it here.
Read ICE's submission to the Infrastructure and Projects Authority on proposals for a new approach to building - and also to download the report.
--The Institution of Civil Engineers
[edit] Related articles on Designing Buildings Wiki
- Advanced manufacturing.
- Construction consolidation centre (CCC).
- ICE articles on Designing Buildings Wiki.
- Mean lean green.
- Modern methods of construction.
- Modular buildings.
- Modular construction market report 2020-2026.
- Offsite manufacturing.
- Offsite manufacturing and standardised design.
- Off-site construction.
- Off site materials.
- Off-site prefabrication of buildings: A guide to connection choices.
- Prefabrication.
- Pre-manufactured value.
- Whole life costs.
Featured articles and news
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.