New Government Hub for York Given Planning Green Light
The application to construct a six-storey, 195,000 sq ft government hub, put forward by partners the Government Property Agency (GPA), Homes England and Network Rail, was approved by the City of York Council Planning Committee.
Earmarked for completion in 2027/2028, the hub will be home to up to 2,600 civil servants. Building features include solar panels, air source heat pumps and a green roof, as well as 230 cycle spaces and a planted pedestrian area.
The development includes 135,000 sq ft of flexible office space, with ground floor retail and ancillary space.
The hub is the first part of York Central - a major initiative to redevelop a substantial area of land close to York city centre and boost the regional economy.
Mark Bourgeois, the GPA’s CEO, said:
We are delighted to achieve planning permission to develop this new facility, which will deliver a modern, inspirational and energy-efficient office development for up to 2,600 civil servants.
The new hub will help to accelerate the York Central development, stimulate economic growth and investment in the North of England as well as supporting the transformation of the Civil Service.
It’s another milestone for us at the Government Property Agency to deliver smart, modern, sustainable and digitally connected workplaces that focus on improving productivity and wellbeing.
York Central is one of the largest brownfield sites in the UK, and is located next to the city’s railway station. The scheme is being brought forward by a collaborative partnership between Homes England, Network Rail, the City of York Council and the National Railway Museum. It will be developed by private sector partners McLaren Property and Arlington Real Estate.
There has been extensive public consultation prior to the submission of the York Central government hub application.
Robin Dobson, Group Property Director at Network Rail, added:
Creating high quality workspace is fundamental to the future success of York Central. Having attracted the GPA, it is great to have reached this important planning milestone ahead of seeing a new workforce bring this regeneration scheme to life.
This article was issued via Press Release as 'New Government Hub for York Given Planning Green Light' dated July 23, 2024.
[edit] Related articles on Designing Buildings
- Bridging loan.
- Business process outsourcing (BPO).
- Buyer-funded development.
- Collateral.
- Construction loan.
- Construction project funding.
- Cost plans.
- Design and access statement.
- Drawdown.
- Equity and loan capital.
- Funder.
- Funding options for building developments.
- Funding prospectus for new developments.
- Funding prospectus.
- Future homes hub.
- Global Real Estate Sustainability Benchmark GRESB.
- Gross development value.
- Leaseback.
- Mezzanine finance.
- PF2.
- Private Finance Initiative.
- Project-based funding.
- Property development finance.
- Property valuation.
- Public project: outline work plan.
- Remortgage.
- Strategic freight hub.
- The HUB, Toronto.
Featured articles and news
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.