Material procurement
Procurement is a term describing the purchasing process for goods and services. In building construction, material procurement is the process by which the materials required to construct a building are selected, ordered, invoiced, paid for and delivered to the site.
A procurement team, or one or more construction buyers may be responsible for procurement activities for products, materials, plant and subcontractors. They typically work for the main contractor(although sub-contractors may also have buyers on large projects) to ensure that supplies are provided in accordance with the project programme, specification and budget. For more information see: Construction buyer
Materials will typically be ordered from the supply chain, often from external suppliers with whom the team may have had past successful dealings, or who may be specified in the contract documents.
Procuring materials is a crucial aspect of the construction process as contractors will normally be inundated with requests from suppliers for the provision of goods and services. They must therefore order materials that align with both the client’s and contractor’s objectives.
Developing the most suitable purchasing strategy will involve selecting material suppliers according to a range of criteria that are likely to include speed of delivery, cost, quality, specific project constraints, risk, asset ownership and financing.
Within a specification, buyers may have flexibility in purchasing, particularly where an architect or engineer has specified a product and added the clause ‘…or equal approved’, upon which the buyers may – for good reason – substitute a different product that must, as a minimum, meet the same standards as the original.
Where a specification stipulates only one type or brand of material/product available from one supplier, the procurement team may be bound to procure that product even though it may consider that there are better equivalent offers on the market.
[edit] Competitive bidding
Suppliers of goods may be selected from a list of registered suppliers of the product/material to be purchased. Selection may be on the basis of a competitive tender, where selected suppliers must submit their most competitive price for the item in question. In some cases, a supplier may be specified on the basis of criteria such as product patent and/or uniqueness of offer.
[edit] Sustainability
In recent years, sustainability has assumed growing importance in the procurement of construction materials, particularly as they are the largest single category of waste going to landfill, and the industry is one of the largest producers of CO2 emissions. Local councils, clients and contractors may influence procurement by, for example, stipulating a minimum percentage of recycled materials must be used.
Whether in the specification or not, procurement teams will usually endeavour to source the most environmentally friendly options combined with value for money. This is particularly important in the light of the 2006 definition of sustainable procurement by the Sustainable Procurement Task Force: ‘A process whereby organisations meet their needs for goods, services, works and utilities in a way that achieves value for money on a whole-life basis in terms of generating benefits not only to the organisation, but also to society and the economy, while minimising damage to the environment.’
So, sustainable procurement assesses value for money in terms of the wider benefits to society, the economy and the environment as well as the narrower benefits of the procuring organisation. This might include consideration of lifecycle impacts, environmental impacts and social impacts. These extrinsic cost considerations are factored into decisions alongside the conventional procurement criteria which have tended to focus on price, quality and time.
In construction, sustainable procurement might involve consideration of the environmental, social and economic consequences of: :
- Design.
- Non-renewable material use.
- Manufacture and production methods.
- Logistics.
- Service delivery.
- Building use and operation.
- Maintenance and repairs.
- Reuse and recycling options.
- Disposal.
Click here for further information on sustainable procurement.
[edit] Related articles on Designing Buildings Wiki
- BREEAM Responsible sourcing of materials.
- Construction buyer.
- Cost led procurement.
- Environmental plan.
- Green Seal.
- Managing the procurement process.
- Procurement route.
- Public procurement.
- Recyclable construction materials.
- Sustainable development.
- Sustainable materials.
- Sustainability.
- Whole life costs.
- Design and build procurement route
- Engineering procurement and construction contract
- Managing the procurement process
- OJEU procurement procedures
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Comments