Key performance indicators KPI
Key performance indicators (KPIs) can be used to:
- Monitor costs.
- Track progress.
- Assess client satisfaction.
- Identify strengths and weaknesses.
- Compare performance across and between projects.
- Assess specific areas of a project such as sustainability, safety, waste management, etc.
It is important that KPIs are identified in tender documentation and that the regular provision of the information required to assess them is a requirement of the contract. This may require the provision of sub-contractor information where performance on specific packages is to be monitored.
KPIs may be of particular importance where the contract stipulates that the contractor will be rewarded or penalised based on their performance relative to certain indicators.
Examples of KPIs that can be used on construction projects include:
- Cost vs. budget. The budgeted cost of work that has actually been performed in carrying out a scheduled task during a specific time period.
- Project progress relative to milestones.
- Number of complaints.
- Number of incidents/accidents.
- The number of working hours spent on different aspects of the works.
- The use of materials (for example, the amount of concrete poured).
- The number of defects.
- The amount of waste generated and the amount of recycling.
- The number of variations.
KPIs are also a means to help with the rapid comprehension of the current financial position. KPIs summarise the comparison of figures against the budgeted values and also industry benchmarks that are published from the result of inter-firm comparison reports.
KPIs to track profitability may include:
- Turnover by director /partner.
- Turnover by fee earner.
- Profit by director/partner.
- Profit by fee earner.
Only genuinely important performance indicators should be monitored so that it does not simply become a time consuming paper exercise.
KPIs can also be used more broadly as part of a bench-marking exercise to assess the performance of one project relative to another, to assess businesses compared to others within the industry and to assess the performance of the industry as a whole relative to the rest of the economy.
[edit] Related articles on Designing Buildings
- Acceleration.
- Benchmarking.
- Best value.
- Budget.
- Building performance.
- Contractor's master programme.
- Defects.
- Design web.
- Earned value.
- Facility condition index FCI.
- Health performance indicators in the built environment.
- How progress is agreed in construction.
- Identifying the causes of trends in construction labour productivity.
- Information release schedules.
- Market value.
- Mechanical and electrical maintenance customer satisfaction KPI's 2017.
- Milestones.
- Performance.
- Performance requirements.
- Programme consultant.
- Progress of construction works.
- Project crashing.
- Project programme.
- Project scorecard.
- RAG rating.
- Schedule performance index (SPI).
- Short period programme.
- Strategic performance targets.
- Time-location chart.
- Time management of construction projects.
- Track record.
- Turnover.
- Variations.
- Value management.
- Whole life costs.
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.

























Comments