Home Survey Standard level 1 survey
The 'RICS Professional Standard 'Home survey standard UK' (HSS - 1st edition, November 2019. Effective from 1 March 2021) defines the HSS A1 Survey level one a service as being:
'...designed for clients (buyers, sellers and owners) seeking a professional and objective report on the condition of the property at an economic price. As a result, it is less comprehensive than survey level two and survey level three. This level of service includes a visual inspection that is less extensive than for the other survey levels. No tests of the building fabric or services are undertaken. The report objectively describes the condition of the building, its services and the grounds. It highlights relevant legal issues and any obvious risks to the building, people or grounds. The report is succinct and provides an assessment of the relative importance of the defects and problems. Where the surveyor is unable to reach a conclusion with reasonable confidence, a recommendation for further investigation should be made. A survey level one report does not include advice on repairs or ongoing maintenance and this, combined with the less extensive inspection, usually means it is better suited to conventionally built, modern dwellings in satisfactory condition. It will not suit older or complex properties, or those in a neglected condition.'
See also Building survey, HSS level 2 survey, HSS level 3 survey and Home Survey Standard HSS
[edit] Related articles on Designing Buildings
- Building archaeology.
- Building pathology.
- Condition Report.
- Ecological survey.
- Ground investigation.
- Historic building investigation.
- Home information pack HIP.
- Homebuyer Report.
- Land surveying.
- Levelling.
- Measurement of existing buildings.
- Site appraisals.
- Site surveys.
- Soil report.
- Soil survey.
- Surveying instruments.
- Surveyor.
- Thermography for traditional buildings.
- Vendor survey.
- Walkover survey.
Featured articles and news
Tackle the decline in Welsh electrical apprenticeships
ECA calls on political parties 100 days to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.






















