[edit] Introduction
A floor is a '...lower horizontal surface of any space in a building including finishes that are laid as part of the permanent construction.'
Flooring usually consists of a structural element and a finish which covers the structure. This finish could be attached to the structure (such as a screed), or merely covering the structure (such as carpet).
Floors will either be solid ground or suspended. Suspended floors could be at ground or upper floor level. They are generally constructed of timber or concrete, either in-situ or pre-cast. Generally, defects in suspended floors arise from deflection or attack by fungus or insects. Problems in upper floors can also occur where a building has been subjected to a change of use, or where there is insufficient insulation to combat noise, especially impact sound transmission.
[edit] Solid floors
Ground floors will either consist of a suspended floor, or of a solid slab, built directly off the ground. Defects may cause a slab to sink, or to lift. Signs of failure in a solid slab which is sinking include:
- Gaps between the underside of skirting boards and the solid floor.
- Cracks adjacent and parallel to perimeter walls.
- Cracks in partition walls built off the slab.
Downward movement in the slab is usually the result of consolidation of the hardcore fill beneath.
If a solid floor slab is damp it may be due to faults in the damp proof membrane (DPM). The location of the damp may provide clues, as will a note of when the damp manifests itself. Impervious floor coverings such as tiles may start to lift. Pervious materials such as carpet may be found to have mould growth on their underside.
[edit] Suspended floors
Failures in suspended timber floors, especially at ground floor level, are liable to be caused by timber infestation, either insect attack or rot.
Deflection or movement in suspended floors may be caused by inadequate joists or by joists at incorrect centres. Changes of use can result in increased loadings, particularly in older buildings. Excessive deflection can cause the outer walls to bow.
In theory there should be no such problems with concrete suspended floors because they will usually have been designed by a structural engineer. However, poor workmanship during construction can result in a floor that does not achieve its design strength. If shuttering is struck too soon then excessive loading may weaken the floor.
[edit] Raised floor
A raised floor (access floor or raised access floor) is a floor created above a solid floor slab, leaving an open void between the two. This void can be used to distribute building services.
If there are defects in the structure below, or in the make up of the raised floor, panels can rock, or joints can separate, creating a potential hazard, and in some cases damaging services. Problems can also occur if the sub-floor is not level, if there is debris in the void, or where very small panels are necessary because of the alignment and spacing of perimeter walls.
If the raised floor is incorrectly specified or installed, it may fail under loading.
[edit] Floor coverings
A power float is a hand-operated machine used to produce a smooth, dense and level surface finish to insitu concrete beds. The use of a power float to provide a finish for an in-situ reinforced concrete floor can result in problems if insufficient curing time is left after pouring. Shrinkage of the floor can result in random cracking.
Cracks may also appear at the junctions of any sheet material or insulation that is laid between the slab and the screed. Where overlaps occur, the screed will be thinner and more vulnerable.
A finish applied to a screed may provide the first clues to flooring problems. If a screed shrinks, any sheet fixed on top may develop ripples.
A floor surface will eventually wear out, either exposing the layer beneath, which may not have the same properties, or creating an unattractive finish.
Damage can also be caused to a floor covering through the use of inappropriate cleaning materials and methods. Sometimes a build up of cleaning materials can cause deterioration.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Ash deafening.
- Bridging.
- Defects.
- Domestic floors: Part 1: Construction, insulation and damp proofing.
- Floating floor.
- Floor definition.
- Floor insulation.
- Flooring.
- Laitance.
- Latent defects.
- Patent defects.
- Raised floor.
- Remedial work.
- Resilient flooring.
- Schedule of defects.
- Separating floor.
- Sistering floor joists.
- Sprung floor.
- Suspended ceiling.
- Timber preservation.
- Types of floor.
Featured articles and news
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.