User contributions
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
- 16:14, 3 November 2011 (diff | hist) Building information modelling BIM
- 16:06, 3 November 2011 (diff | hist) OGC gateway review 1
- 16:06, 3 November 2011 (diff | hist) OGC gateway review 1
- 16:04, 3 November 2011 (diff | hist) Site waste management plan SWMP
- 15:48, 3 November 2011 (diff | hist) Planning permission
- 15:45, 3 November 2011 (diff | hist) N Planning permission (Created page with "The [http://www.communities.gov.uk/planningandbuilding/ Department for Communities and Local Government] decides national planning policy. National planning policies are set out ...")
- 15:31, 3 November 2011 (diff | hist) User:Designing Buildings
- 15:31, 3 November 2011 (diff | hist) N File:Gregorharvie.jpg (top)
- 15:28, 3 November 2011 (diff | hist) User:Designing Buildings
- 15:23, 3 November 2011 (diff | hist) Traditional contract: construction
- 15:22, 3 November 2011 (diff | hist) Traditional contract: tender
- 15:21, 3 November 2011 (diff | hist) Traditional contract: project brief
- 15:21, 3 November 2011 (diff | hist) Traditional contract: feasibility studies
- 15:19, 3 November 2011 (diff | hist) Traditional contract: feasibility studies
- 15:18, 3 November 2011 (diff | hist) Traditional contract: business justification
- 12:08, 3 November 2011 (diff | hist) N Project handbook (Created page with "The project handbook sets out responsibilities, procedures, and lines of communication for construction. This is separate document from the construction phase plan which is a req...")
- 12:07, 3 November 2011 (diff | hist) N Project manager (Created page with "The project manager is a specialist advisor that represents the client, responsible for the day-to-day management of the project. If a project manager is appointed, they functio...")
- 12:03, 3 November 2011 (diff | hist) N Project sponsor for building design and construction (Created page with "On publicly-funded projects following the Office of Government Commerce (OGC) ( now part of the new Efficiency and Reform Group (ERG) within the Cabinet Office) gateway process, ...")
- 11:55, 3 November 2011 (diff | hist) N Provisional sum (Created page with "A provisional sum is an allowance usually estimated by the cost consultant and inserted into tender documents for a specific element of work not yet defined in enough detail for ...")
- 11:51, 3 November 2011 (diff | hist) N Request for proposals from consultants RFP (Created page with "A document requesting a consultant's proposal sometimes called a 'request for proposals' should be collated and sent out to each prospective consultant listing the assumptions up...")
- 11:49, 3 November 2011 (diff | hist) N Restrictive covenant (Created page with "A restrictive covenants, is a restriction imposed by a seller of a piece of land that prevents the buyer from using it in a way that could cause harm to land the seller has retai...")
- 11:46, 3 November 2011 (diff | hist) N Retention in construction contracts (Created page with "Retention is a percentage (often 5%) of the amount certified as due to the contractor on an interim certificate that is deducted from the amount due and retained by the client. T...")
- 11:43, 3 November 2011 (diff | hist) N Right of way (Created page with "A right of way is a form of easement which allows the person entitled pedestrian or vehicular access across the land of another person. This right can be in the form of a Deed, o...")
- 11:38, 3 November 2011 (diff | hist) N Risk assessment for construction (Created page with "The process of design risk management is a requirement of the CDM (The Construction (Design and Management) Regulations 2007). '''The key aim of CDM2007 is to integrate health a...")
- 11:32, 3 November 2011 (diff | hist) N Room data sheet (Created page with "Room data sheets give a detailed description of all the finishes, fixtures and fittings, mechanical and electrical requirements that will be required for each room. Room data she...")
- 11:29, 3 November 2011 (diff | hist) Briefing documents for building design
- 11:27, 3 November 2011 (diff | hist) N Schedule of work for construction (Created page with "Schedules of work are 'without quantities' instructional lists often produced on smaller projects or for alteration work for pricing as an alternative to bills of quantities, or ...")
- 11:22, 3 November 2011 (diff | hist) N Schedule of defects (Created page with "The schedule of defects is issued by the contract administrator at the end of defects liability period. It identifies defects (aspects of the works that are not in accordance wit...")
- 11:20, 3 November 2011 (diff | hist) N Scoping study for environmental impact assessment (Created page with "A scoping study (sometimes called a scoping opinion) is the process of determining the content of an environmental impact assessment where an environmental impact assessment is r...")
- 11:16, 3 November 2011 (diff | hist) N Screening decision for environmental impact assessment (Created page with "A screening decision (or screening opinion) is the process of determining whether an environmental impact assessment is required as part of a planning application for a project. ...")
- 11:09, 3 November 2011 (diff | hist) N Sectional completion in construction contracts (Created page with "Sectional completion refers to construction contracts for which there are different completion dates for different sections of the works. This is common on large projects that ar...")
- 11:08, 3 November 2011 (diff | hist) N Senior responsible owner (Created page with "On publicly-funded projects following the Office of Government Commerce (OGC) ( now part of the new Efficiency and Reform Group (ERG) within the Cabinet Office) gateway process, ...")
- 10:58, 3 November 2011 (diff | hist) N Services engineer (Created page with "The services engineer may be responsible for the design of: *Location of all major plant and equipment. *Position of vertical service risers. *Routes for distribution of horizon...")
- 10:39, 3 November 2011 (diff | hist) N Set off in construction contracts (Created page with "Set off is a legal process of party A defending a claim brought by party B, by A setting off in extinction or diminution of B’s claim, claims which A alleges against B. Whilst ...")
- 10:36, 3 November 2011 (diff | hist) N Site appraisal for construction (Created page with "Very early appraisals of potential sites for the development may be carried out before the appointment of the consultant team during the business justification stage by a surveyo...")
- 10:33, 3 November 2011 (diff | hist) N Site information for design and construction (Created page with "Site information refers to information that the client has about the site that might be relevant to the consultant team. This could include information about: *Existing use / si...")
- 10:30, 3 November 2011 (diff | hist) N Site inspector for construction works (Created page with "On large projects (over £20m) it may be appropriate to appoint a resident site inspector (sometimes referred to as a clerk of works) to inspect construction works as they procee...")
- 10:25, 3 November 2011 (diff | hist) N Site layout plan for construction (Site layout plan for construction prepared by the contractor)
- 10:23, 3 November 2011 (diff | hist) N Site surveys (Created page with "Site surveys are detailed studies to supplement the site information provided by the client and the site appraisals carried out by the consultant team. Site surveys might be carr...")
- 10:13, 3 November 2011 (diff | hist) N OGC gateway review 2 (Created page with "The Office of Government Commerce (OGC) has established a detailed gateway review process for public procurement.<br> '''The OGC Gateway Process examines programmes and projects...")
- 10:00, 3 November 2011 (diff | hist) N Site waste management plan SWMP (Created page with "The [http://www.legislation.gov.uk/uksi/2008/314/contents/made Site Waste Management Plans Regulations] place additional obligations on the client (other than domestic clien...")
- 09:50, 3 November 2011 (diff | hist) N Specialist designer for construction projects (Created page with "As buildings become increasingly complicated, it is more and more common for specialists to be required to design particular aspects. Specialist designers may be: *Contractors...")
- 09:48, 3 November 2011 (diff | hist) N Specialist contractor (Created page with "Development proposals may include specialist components that are best designed in detail by their manufacturers or installers. Such items could include; lifts, escalators, claddi...")
- 09:47, 3 November 2011 (diff | hist) N Specialist contractors start-up meeting (Created page with "A formal start-up meeting with specialist contractors is an opportunity to: *Issue appropriate project documentation. *Agree lines of communication. *Agree change control proce...")
- 09:46, 3 November 2011 (diff | hist) N Specification for construction (Created page with "Specifications are written documents that describe the materials and workmanship required for a development. They do not include cost, quantity or drawn information but need to b...")
- 09:39, 3 November 2011 (diff | hist) N Stakeholders in development projects (Created page with "The term 'stakeholder' refers to anyone that has an interest in a project and can influence its success. It is important to identify stakeholders in the project as ea...")
- 09:30, 3 November 2011 (diff | hist) N Statutory approvals for buildings (Created page with "Other than planning permission, the main statutory approval that will be required is building regulations approval. The Department for Communities and Local Government is respons...")
- 09:23, 3 November 2011 (diff | hist) N Statutory authorities (Created page with "<br>Statutory consultees for the purposes of planning applications may include: *Local authority. *Parish and community councils. *Building control. *British Waterways Board. *C...")
- 09:14, 3 November 2011 (diff | hist) N Statement of need for building design and construction (Created page with "The statement of need is the first stage in an ongoing process to define the client's requirements: *Statement of need: a first attempt to describe the possible requirements of ...")
- 09:08, 3 November 2011 (diff | hist) N Strategic brief for construction projects (Created page with "The strategic brief is part of an ongoing process to define the client's requirements: *Statement of need: a first attempt to describe the possible requirements of the project *...")
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
Featured articles and news
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.