Y:Cube
The first Y:Cube was an affordable housing unit designed by Rogers Stirk Harbour + Partners (RSHP) at 200 The Broadway, Wimbledon, London.
RSHP and SIG (a supplier of specialist construction products) worked with the YMCA London South West to develop an economic and innovative housing solution, providing self-contained and affordable starter accommodation for young people unable to gain a first step on the housing ladder or pay the high costs of private rent.
The Y:Cube units are 26m2 one-bed studios for single occupancy that arrive on site as self-contained units. Each one is constructed in the factory with building services already incorporated. Water, heating and electricity can be easily connected to existing facilities or to other Y:Cubes already on site. This ‘plug and play’ approach results in a modular, demountable system of apartments that are perfectly designed for brownfield sites. Additional units can be added if needed and whole developments can be taken apart and rebuilt in new locations. This modern method of construction makes for a neighbourly, clean and quiet site.
Each unit is constructed from high quality, environmentally-efficient materials (primarily renewable timber) and can achieve a level 6 Code for Sustainable Homes rating. The factory conditions in which the pods are assembled ensures tolerances of 2mm, creating accommodation that is well insulated and requires little or no heating, even in winter months. The rent is set at 65% below the market rate.
Every resident is either referred by the London Borough of Merton or a previous resident of the YMCA. The Y:Cube provides an alternative to poor-quality, shared accommodation managed by private landlords and can offer a better solution for those in housing need within the community.
Y:Cube Housing offers a real opportunity for social investment, providing a solid return to investors whilst at the same time meeting a huge need.
Richard Blakeway, Deputy Mayor of Housing said, “Y:Cube is a fantastic example of the innovative housing projects we support to address a range of housing demands. We need bold ideas to stimulate growth and address the historic failure to build enough homes and modular construction has an important role.”
- Place: London, UK
- Date: 2013 - ongoing
- Cost: £1.6 million (for a 36-unit development)
- Area: 1640 m²
- Client: YMCA
- Architect: Rogers Stirk Harbour + Partners
- Services Engineer: PBA
- Landscape Architect: Landform
- Manufacturer: Insulshell
Watch a time lapse video of the Y-Cube construction process on Vimeo.
A 36-unit Y:Cube development was created in Mitcham in 2015. See Y:Cube development in Mitcham for more information.
At the beginning of 2016, 7 further Y:Cube schemes, were proposed, including sites in Essex, south-west London and on the south coast of England, ranging in size from 15 to 36 apartments. Ref Construction Manager Magazine, 19 January 2015.
[edit] Related articles on Designing Buildings Wiki
- BRE Üserhuus.
- British post-war mass housing.
- Container City.
- McArthurGlen Designer Outlet Ashford.
- Modular buildings.
- Off-site prefabrication of buildings: A guide to connection choices.
- Open source architectural plans for modular buildings.
- Plug-In to Housing.
- Prefabrication.
- Skyfarm.
- WikiHouse.
- Y:Cube development in Mitcham.
[edit] External references
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.