Structural engineers' fees
Fees are generally payments to consultants to cover work they have undertaken for clients under the terms of an agreement. They are generally paid in instalments, either on regular dates or at pre-agreed stages of completed work.
Structural engineers fees may be calcuated based on time charges, as a fixed lump sum or as a percentage of the overall project cost. Fees are entirely dependent on the nature of the project and the circumstances of the appointment. Large new-build projects may attract lower percentage fees than small works to existing buildings (see table below), commercial work may attract lower fees than private residential work, and works to historic or listed buildings may attract higher fees.
The examples given below are indicative only and apply mainly to small projects. Fee calculation may be based on:
- Charging a lump sum, particularly for small projects (eg £1,000 for a standard domestic extension, plus extra for structural details or special foundations; or £750 for a loft conversion inclusive of calculations and structural details);
- Flat-rate fees: site visits (eg starting at £150 per visit); design of steel beams and bearing details (eg, £75 for a single beam and £50 for each beam thereafter); masonry check (eg £100); goal-post frame (eg £200 - £300); and steel connections (eg £50 per connection).
- Hourly or daily rates (eg £80-£100/hour; £400-£500 per half day, etc);
- A percentage of the project’s total cost (see table below).
The fee percentage will depend on the size of the project (in project cost terms). The following table gives the fees a structural engineer might charge (at 2013 prices) for work undertaken on commercial office developments in London of varying costs.
| Construction cost (excl. contingencies and VAT) | Under £1.5m | £1.5m - £3m | £3m - £10m | £10m - £25m | £25m –£50m | £50m+ |
| Struct'al engineer % and actual fee |
2% £30k max |
2% £30k – £60k |
1.8% £54k– £180k |
1.5% £150k – £375k |
1% £250k – £500k |
1% £500k+ |
Other things that might affect the fees charged include:
- Type and complexity of project (eg hospital v industrial shed);
- Scope of services. For example, full design and site inspection will attract a higher fee than a preliminary design that is then developed by the contractor;
- Anticipated repeat and/or bespoke elements of the design;
- Location of site and other consultant practices;
- Reputation of practice. For example, an accomplished engineering firm may charge more than one that is newly qualified;
- Client organisation and track record. This may affect how much support is required and the risk perceived by the engineers;
- Conditions of engagement. For example, the requirement for collateral warranties and partnering arrangements;
- Anticipated programme and resources required.
- Economic climate. Fees may be lower during recessions and higher during booms;
- Consultant workload, and
- Assessment of the competencies of other consultants.
When agreeing fees, it is important to be clear exactly what services are being provided, for example, do the fees include travel, printing costs, outline and detailed planning applications and so on. For more information see: Scope of services.
Professional institutes used to publish recommended fee scales expressed as a percentage of construction costs for a range of different building types. However, legislation aimed at preventing anti-competitive behaviour forced the institutes to abolish these scales, leaving little guidance for clients about what is normal.
Consequently, bidding for consultancy work has become a free-for-all in a highly competitive market. Some commentators argue that this has driven down fees, however, it may also have driven down standards and led to much design work being transferred from consultants to specialist contractors and suppliers who include design costs in their building agreements.
It is important therefore to obtain several quotes for fees, to be clear what is being provided and to be wary of just assuming the lowest quote provides the best value.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Architects fees.
- Base date.
- Charge-out rate.
- Compensation.
- Consideration.
- Construction organisations and strategy.
- Consultant team.
- Contractual obligation.
- Design team.
- Disbursement.
- Hourly rate.
- Invoice.
- Letter of appointment.
- Planning fees.
- Quantity surveyor’s fees.
- Rates.
- Schedule of services.
- Scope of services.
- Sub-consultant.
- Winning work.
Featured articles and news
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
























Comments
It would be nice if you could update the table to show a more realistic (current for 2021) percentage of fee.
These numbers are quite a way off what the market is currently.
This is a WIki site - if you have better information, please click 'Edit this article' and add it.