Letter of appointment for consultants
Letters of appointment (or letters of acceptance, or letter contracts) are sometimes used to appoint consultants in cases when a client wants the consultant to start work quickly, while a full contract is being prepared.
The letter should put a time limit on its validity and make it clear a contract will supersede and replace anything expressed in the letter of appointment.
Ideally the letter should include:
- A brief description of the project.
- A scope of work to be undertaken.
- The fee (excluding VAT) to be paid within the time period, and when it is to be paid.
- Allowable expenses.
- The date for the start of work and the period covered by the letter.
- The right of the client to use material generated in the time period.
- A statement that the letter is an interim arrangement to be substituted by a contract.
- A statement that there is no guarantee to extend the appointment beyond the time period stated.
- The amount of professional indemnity insurance cover required for the project.
- The named staff or sub-consultants who will carry out the commission.
- The consultant’s reporting lines within the client organisation.
- A statement allowing termination of the agreement at will by either party, but with a fair proportion of the fee to be paid by the client as well as properly incurred and recorded expenses.
- A statement confirming that unresolved disputes will be settled by adjudication under English Law.
Letters of appointment may also be appropriate if a consultant is required for a very insubstantial or minor commission where a full-blown contract could be seen as heavy handed and off-putting. This also applies to small side-projects such as commissioning a sculpture from a particular artist. In such circumstances, many of the items listed above should be included in the letter, together with a programme and budget.
The appointment letter should be duplicated for the consultant’s retention and return. It should have an acceptance clause for the consultant’s signature at the end and the consultant should be asked to initial the foot of each page.
NB Contractors are treated slightly differently, using a letter of intent for temporary purposes prior to engrossment and execution of contract documents. See Letter of intent for more information.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.