Optimised contractor involvement (OCI) is a variation of the ‘early contractor involvement’ (ECI) model that has been adopted widely in the infrastructure sector on large and complex projects.
Devised by Steve Rowsell, Procurement Director for Crossrail, OCI is intended to ensure contract packages are subject to effective competition and maximum output with the available resources.
The subtle difference between ECI and OCI is that in ECI, a contractor’s skills are introduced early into a project to bring design buildability and cost efficiencies to the pre-construction phase. In OCI, contractors are brought in at a stage that is late enough for the target price to be quite firm, but early enough for them to be able to influence buildability and value engineering.
ECI has been used on by many public sector construction clients, however, some clients have been reluctant to adopt the strategy because of concerns associated with appointing contractors before permissions such as planning have been granted, and issues to do with attracting accurate and competitive prices from contractors when the design is not yet well advanced.
The OCI approach optimises contractor involvement, rather than simply trying to make it as early as possible, waiting till a point when the contractor is more likely to be able to offer an accurate and competitive price.
The contractor input into the design under OCI generally takes place post contract award, whereas in ECI, it takes place pre-contract award, under an arrangement such as a Pre-Construction Services Agreement.
The OCI approach may adopt a two stage selection process. The first stage is based on an assessment of the contractor’s technical and quality competence. The second stage involves the shortlisted tenderers carrying out a review of the client’s design. The tenderers then submit their final proposals, including a target price.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A landmark moment for postmodern heritage.
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.