On site storage solutions
It is estimated that the Earth’s population will have increased to 9 billion by 2050. Of those 9 billion people, 66% will be living in cities. In already densely-populated cities like London, Manchester and Birmingham - this growth will result in a tight squeeze.
While the increasing popularity of urban living is good news for architects, developers and contractors; it still poses a number of problems. In cities that already have limited space, the only solution is to build upwards.
Whether retrofitting or delivering a new development, the distinct lack of space can pose a real issue for everyone throughout the supply chain. Not only do contractors and sub-contractors have to battle with limited space, but the lack of storage can also mean there’s nowhere to store vital equipment and project components.
On-site storage is a vital consideration for any project. Not only for health and safety, but to preserve the materials and tools being used, including bricks, sand, power tools and machinery.
Different types of material will have different storage requirements. For example, bricks should be stored on level ground with excellent drainage. They should be stacked on edge in rows, up to a maximum height of 2.4 m and covered with a polythene sheet in order to protect against efflorescence. Additionally, an area of at least 5 m should be left in order to allow for a forklift.
If they’re being stored on site, it’s recommended for drainage pipes to be stored in an open compound. They should be stacked horizontally with spigots and sockets reversed in alternate layers until they are required - taking up precious space on site.
However, with a lack of space becoming a common challenge on construction sites - manufacturers, are offering alternative solutions, reducing the need for on-site storage, frequently delivering products to sites with limited storage. Able to work with project managers to work out an exact delivery schedule, manufacturers can ensure their products don’t reach the site before they’re needed, meaning they won’t take up precious space. They can even deliver items in a floor-by-floor sequence as and when they’re required.
--Polypipe Terrain 10:01, 15 Aug 2018 (BST)
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Construction consolidation centre (CCC).
- Construction logistics manager.
- Fabricated drainage stacks.
- Forklift.
- Hazardous substances.
- Lead time.
- Logistics management.
- Materials on site.
- Off site materials.
- Retention of title.
- Site facilities.
- Site layout plan.
- Site storage.
- Site Waste Management Plan.
- Vesting certificate.
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.