On site storage solutions
It is estimated that the Earth’s population will have increased to 9 billion by 2050. Of those 9 billion people, 66% will be living in cities. In already densely-populated cities like London, Manchester and Birmingham - this growth will result in a tight squeeze.
While the increasing popularity of urban living is good news for architects, developers and contractors; it still poses a number of problems. In cities that already have limited space, the only solution is to build upwards.
Whether retrofitting or delivering a new development, the distinct lack of space can pose a real issue for everyone throughout the supply chain. Not only do contractors and sub-contractors have to battle with limited space, but the lack of storage can also mean there’s nowhere to store vital equipment and project components.
On-site storage is a vital consideration for any project. Not only for health and safety, but to preserve the materials and tools being used, including bricks, sand, power tools and machinery.
Different types of material will have different storage requirements. For example, bricks should be stored on level ground with excellent drainage. They should be stacked on edge in rows, up to a maximum height of 2.4 m and covered with a polythene sheet in order to protect against efflorescence. Additionally, an area of at least 5 m should be left in order to allow for a forklift.
If they’re being stored on site, it’s recommended for drainage pipes to be stored in an open compound. They should be stacked horizontally with spigots and sockets reversed in alternate layers until they are required - taking up precious space on site.
However, with a lack of space becoming a common challenge on construction sites - manufacturers, are offering alternative solutions, reducing the need for on-site storage, frequently delivering products to sites with limited storage. Able to work with project managers to work out an exact delivery schedule, manufacturers can ensure their products don’t reach the site before they’re needed, meaning they won’t take up precious space. They can even deliver items in a floor-by-floor sequence as and when they’re required.
--Polypipe Terrain 10:01, 15 Aug 2018 (BST)
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Construction consolidation centre (CCC).
- Construction logistics manager.
- Fabricated drainage stacks.
- Forklift.
- Hazardous substances.
- Lead time.
- Logistics management.
- Materials on site.
- Off site materials.
- Retention of title.
- Site facilities.
- Site layout plan.
- Site storage.
- Site Waste Management Plan.
- Vesting certificate.
Featured articles and news
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.