On site storage solutions
It is estimated that the Earth’s population will have increased to 9 billion by 2050. Of those 9 billion people, 66% will be living in cities. In already densely-populated cities like London, Manchester and Birmingham - this growth will result in a tight squeeze.
While the increasing popularity of urban living is good news for architects, developers and contractors; it still poses a number of problems. In cities that already have limited space, the only solution is to build upwards.
Whether retrofitting or delivering a new development, the distinct lack of space can pose a real issue for everyone throughout the supply chain. Not only do contractors and sub-contractors have to battle with limited space, but the lack of storage can also mean there’s nowhere to store vital equipment and project components.
On-site storage is a vital consideration for any project. Not only for health and safety, but to preserve the materials and tools being used, including bricks, sand, power tools and machinery.
Different types of material will have different storage requirements. For example, bricks should be stored on level ground with excellent drainage. They should be stacked on edge in rows, up to a maximum height of 2.4 m and covered with a polythene sheet in order to protect against efflorescence. Additionally, an area of at least 5 m should be left in order to allow for a forklift.
If they’re being stored on site, it’s recommended for drainage pipes to be stored in an open compound. They should be stacked horizontally with spigots and sockets reversed in alternate layers until they are required - taking up precious space on site.
However, with a lack of space becoming a common challenge on construction sites - manufacturers, are offering alternative solutions, reducing the need for on-site storage, frequently delivering products to sites with limited storage. Able to work with project managers to work out an exact delivery schedule, manufacturers can ensure their products don’t reach the site before they’re needed, meaning they won’t take up precious space. They can even deliver items in a floor-by-floor sequence as and when they’re required.
--Polypipe Terrain 10:01, 15 Aug 2018 (BST)
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Construction consolidation centre (CCC).
- Construction logistics manager.
- Fabricated drainage stacks.
- Forklift.
- Hazardous substances.
- Lead time.
- Logistics management.
- Materials on site.
- Off site materials.
- Retention of title.
- Site facilities.
- Site layout plan.
- Site storage.
- Site Waste Management Plan.
- Vesting certificate.
Featured articles and news
Prioritising tax considerations.
Reviewing the Double Diamond Design model
The four D creative process: discover, define, develop and deliver.
National Cyber Security Centre initiative is announced.
The impact of COVID-19 on global HVAC&R markets
Reviewing trends and projections.
Legislation will establish initiatives to move towards net zero.
Status determination statement
How to document contractor employment status.
Social distancing goes high tech
Tech tools to help manage people and space post-pandemic.
Eclectic Edwardian architecture
A style that ranges from mock Tudor to arts and crafts to the 'Wrenaissance'.
Free guide from Secured by Design.
Building Back Better: Circularity
BREEAM strategy for sustainability and the circular economy.
Free tool to improve the construction programming process.
Building services verification
Are buildings doing what they're supposed to be doing?
Cities with quick access to everything by foot or bike.
The pressures and pinch points of global destinations.