Off-site construction
The phrase 'off-site construction' refers to the completion of elements or components of a construction project at a different location to where they will be permanently installed. Typically, this can involve planning, design, fabrication and assembly in purpose-built off-site factories. The completed item is then transported to site and assembled in place.
Off-site locations may be permanent manufacturing facilities, or 'flying factories', that is, temporary facilities that operate for the duration of a project and then 'fly' to a new location to service another project.
Off-site construction is often referred to as 'prefabrication', 'off-site manufacture' or 'modern methods of construction', and it may involve modular construction. It is most commonly concerned with permanent structures rather than temporary or relocatable structures.
Mark Farmer's 2017 report 'Modernise or die' adopted the term 'pre-manufacture' as '...a generic term to embrace all processes which reduce the level of on-site labour intensity and delivery risk', and suggested that this could range from '...component level standardisation and lean processes through to completely pre-finished volumetric solutions'.
Off-site construction has increasingly been promoted as a solution to many of the problems facing the UK construction industry. This is because of the significant time-efficiencies that can be achieved through using off-site techniques, as well as better safety, reduced waste, higher quality, reduced down time and so on.
Off-site construction is particularly suited to high-volume, repetitive components, or products that require factory conditions to achieve the desired level of quality. It is widely considered that housing should be an obvious target for off-site construction.
However, the initial set-up costs can be high, and it can be difficult to maintain a sufficiently consistent pipeline of demand to suit assembly line production methods. Transport costs can also be high. In addition, there have been lingering concerns regarding the label 'prefabricated' as a result of poor-quality mass-produced housing that was pre-fabricated following the second world war, as well as the Ronan Point collapse in 1968.
Modernise or die looked forward to a fourth industrial revolution underpinned by cyber-physical ‘smart’ production techniques, which it described as 'Industry 4.0’. However, it acknowledged that in many respects, construction has yet to achieve ‘Industry 3.0’ status, which would simply require large scale use of electronics and IT to automate production.
[edit] Related articles on Designing Buildings
- Advanced manufacturing.
- BSRIA launches Offsite Construction for Building Services topic guide.
- Construction problems avoided by using a modular approach.
- Design for Manufacture and Assembly (DfMA).
- Flying factory for construction works.
- In situ.
- Modern methods of construction.
- Modular buildings.
- Modular construction market report 2020-2026.
- Off site materials.
- Offsite manufacturing.
- Off-site manufacturing.
- Offsite manufacturing and standardised design.
- Off-site manufacture for construction: Building for change.
- Off site, on track.
- Off-site prefabrication of buildings: A guide to connection choices.
- Prefabrication.
Featured articles and news
Not buildings. Happy holiday from DB.
Future Homes Standard: Industry calls for more ambition
As the Government FHS consultation finally closes.
Improving government projects with data and AI
Enabling better outcomes, efficient modern delivery and influential leadership on government projects.
BSRIA Living Laboratory Innovation Challenge
Final days for submission, closing March 29.
Windows, their frames, forms, factors and functions.
The hidden subtleties of U-Value calculations
Different contexts and what to include as variables.
A brief run down with related articles.
Electrical sector calls for safer public EV charge points
Serious concerns about electrical safety in the public domain.
Building Blocks manifesto presented to parliament
Architects Declare call in for support of five critical policies.
The four elements of project management with APM
Analysis, expectations, collaborative communication and partnerships.
City of London launches Heritage Building Retrofit Toolkit
Empowering owners to initiate necessary adaptations.
Guidance on RAAC in listed buildings
Published by Purcell, endorsed by IHBC, SPAB and C20.
Learning from the past.
Reluctance to hire people with criminal convictions revealed
Employing People with Criminal Convictions Report.
Tackling unconscious bias; Women's History Month
Personal reflections, as the last week of March approaches.