[edit] Introduction
In April 2017, the Institution of Civil Engineers, in collaboration with BSI and Infrastructure UK in HM Treasury, published PAS 256, a national common code of practice on buried apparatus that can be implemented across the UK.
The UK has a vast network of utility and local authority infrastructure, with over 1.5 million km of assets buried beneath highways and footways.
To repair, maintain and upgrade this, the utility industry and the Local Highways Authorities collectively undertake a total of over 3.5 million street works per annum.
In recent years, with the growing concern over the level of traffic congestion, efforts have been made to improve the administration procedures for street works and to encourage utilities to minimise their work in the street.
However, despite some progress, there remains no central repository of data for buried services and underground apparatus, nor any consistent means of sharing the required data. Utilities that hold data on their own infrastructure do so in different formats – some vector-based, some on paper drawings, some on microfiche – which makes coordination of information challenging, costly and bureaucratic.
Improving the ready availability and exchange of asset information, together with more effective and collaborative planning and coordination will lead to better planned road works resulting in significant cost savings; more effective reinstatement practices; longer pavement life; and improved quality of advance information, readily available to all who need to see it.
Ultimately, it is hoped that the new PAS can support the creation of a coordinated digital map using real world location and deliver a step change in how effective, managed data supports improved planning, co-ordination and delivery.
[edit] Who is this PAS for?
It will be used by organisations that own buried assets, those that require asset records for planning and design purposes, and those that carry out work in the vicinity of buried assets.
It will build on the existing legislation of the New Roads and Street Works Act (NRSWA) and take the next step forward from PAS 128: Specification for underground utility detection, verification and location (2014). PAS 128 set out the accuracy to which the data should be captured, the quality expected of the data and a means by which to assess and indicate the confidence that can be placed in the data.
[edit] Aims of the PAS and why it should be used
The data recommendations in the PAS will help to increase public safety, minimise delay, costs and disruption during street works and mitigate risks of damaging existing assets.
This PAS aims to provide the framework for those owning buried assets to:
- Drive towards improved accuracy when capturing and recording information.
- Share more accurate records collaboratively with those working in the vicinity of their buried assets.
- Improve the linkage between assets that are part of the critical national infrastructure with initiatives such as smart cities and BIM.
This PAS sets out a consistent, accessible data protocol to enable effective recording and sharing of the location, state, and nature of buried assets, and recommends how existing asset records should be updated, recorded and collated.
This PAS will also cover:
- The gathering of geospatial data using absolute or relative accuracy, plus associated evidence (such as photographic evidence).
- Measurable deviations from straight line installations where appropriate.
- The absolute depth of the asset.
- The number of days to record and make available the asset data, once collected.
- The sharing of collected asset data.
This article was originally published here on 11 Apr 2017 by ICE. It was written by Rabinder Phull.
--The Institution of Civil Engineers
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Building services engineer.
- Construction drones
- Crossrail 2.
- How to work safely on a construction site in the dark.
- Institution of Civil Engineers.
- Lighting of construction sites.
- Masterplanning.
- Mechanical ventilation.
- Printing 3D models of buildings.
- Open data - how can it aid the development of the construction industry?
- Site appraisal.
- Site information.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.