Core clause
In language, a clause is a group of words that includes a subject, predicate and a verb. A clause can either form a complete sentence or form part of a sentence. A sentence can contain one or more clauses.
In construction, clauses are seen in many forms of documentation. They are usually in the form of a section, phrase, segment or paragraph that deals with a specific issue. Clauses may be numbered for easy reference. A clause in a contract typically addresses a particular aspect of the agreement between the parties to the contract. Standard contractual clauses are available that have been prepared to ensure consistency of meaning and interpretation, to reduce the amount of time required to draft a contract, and to build on prior experience such as case law.
Core clauses are referred to in the New Engineering Contract (NEC) suite of documents. These are standard forms of construction contracts published by the Institution of Civil Engineers (ICE) and form the basis for many major construction projects in the UK and overseas.
Known for their clarity, simplicity and use of plain English, NEC contracts have numerous core clauses. These clauses are the same in every form and cover the basic reference conditions that apply to every contract.
NEC 4, introduced in July 2017, contains the following core clauses:
- Core clause 1: General, incorporates defined terms (e.g ‘subcontractor’), interpretations, communications and ambiguities;
- Core clause 2: Sets out the contractor’s main responsibilities;
- Core clause 3: Covers time, starting/completion dates, key dates, programme, access, etc;
- Core clause 4: Quality management (QM), contractor’s obligation to produce a QM system, quality plan, etc;
- Core clause 5: Payment of amounts due, payment provisions etc;
- Core clause 6: Compensation events – which may involve time/money components;
- Core clause 7: Title – entitlement to use plant and materials e.g contractor using client materials;
- Core clause 8: Liabilities and insurance, employer and contractor liabilities, insurance requirements, and
- Core clause 9: Terminations – grounds for terminations – procedures and payments.
[edit] Related articles on Designing Buildings Wiki
- Association of Consultant Architects TAC-1 launch and BIM.
- Compensation events and Brexit.
- Construction contract.
- Contract conditions.
- ICE Conditions of Contract.
- JCT.
- NEC early warning notices - a tool of mutual benefit.
- NEC3.
- NEC4 Alliance contract.
- NEC4 Design, Build and Operate Contract.
- NEC4 - legal and insurance aspects.
- NEC contract change management systems.
- NEC4 contract creates a procurement alliance arrangement for all stakeholders
- Procurement route.
Featured articles and news
Encourage individuals to take action to save water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
[[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DConstruction_contract_awards_down_1bn%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|Construction contract awards down £1bn]]
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.