New code of estimating practice
The Code of Estimating Practice was originally published by the Chartered Institute of Building (CIOB) in 1996. It went on to become a highly-respected industry resource, providing an authoritative guide to the principles of, and good practice in, estimating for building work for those involved in procuring and pricing construction works, both in the public and private sectors.
It presents estimating as part of the wider process of commercial management for construction businesses. This is not simply a matter of winning a bid - if the bid is successful, the estimate goes on to form the basis of the contractor’s budget and cost management strategy.
The seventh edition was published in 2009 and included new material on estimating strategy, tendering, procedures and best practice, as well as the build-up of unit rates of cost, overheads and profit, and e-commerce.
In March 2018, it was re-branded as the New Code of Estimating Practice. https://www.wiley.com/en-gb/New+Code+of+Estimating+Practice-p-9781119329640
This new version has been completely rewritten to include more contextual and educational material, and now covers:
- Estimating practice.
- The bidding process.
- The fundamentals in formulating a bid.
- The pre-qualification process.
- Procurement options.
- Contractual arrangements and legal issues.
- Preliminaries.
- Temporary works.
- Cost estimating techniques.
- Risk management.
- Logistics.
- Resource and production planning.
- Computer-aided estimating.
- Information and time planning.
- Resource planning and pricing.
- Preparation of an estimator’s report.
- Bid assembly and adjudication.
- Pre-production planning and processes.
- Site production.
--CIOB
[edit] Related articles on Designing Buildings Wiki
- Approximate quantities cost plan.
- Bills of quantities.
- Budget.
- Chartered Institute of Building.
- All-in rates.
- Contract sum analysis.
- Contract sum.
- Cost consultant.
- Cost control.
- Cost engineering.
- Cost plans for construction projects.
- Elemental cost plan
- Final account.
- Initial cost appraisals.
- Mark-up.
- Measurement.
- New Rules of Measurement.
- Pre-tender estimate.
- Procurement.
- Project overheads.
- Tender documents.
- Top down and bottom up estimating.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.