What you need to know when hiring a crane
Contents |
[edit] Introduction
If you are building anything high, you are likely to need a crane to complete it. Even smaller housing residences can need a crane for roofing. However, cranes are not uniform, and there are several types to choose from. In order not to make the wrong choice, you have to be aware of all the relevant factors when it comes to hiring a suitable crane.
[edit] Boom length and the tail swing
Since it is unlikely that you will build on an open meadow, your crane operator will have to navigate carefully. There are other buildings, power lines, and bridges that need to be avoided. That is why the crane has to have the right length of the boom at the front and not much of a tail swing at the back. Make the calculation of the diameter the crane can move and rotate within.
[edit] Decreasing the noise levels
Although construction can be quite noisy at times, regulations in most countries require you to keep the noise down. Cranes can be loud because of their size. Diesel-powered cranes are in general louder than the electrical ones. Choose the latter type to keep the noise to a minimum.
[edit] Hook line speed
If you are constructing a tall building, then look for cranes with high gear hook line speeds. This will ensure that the cargo gets to height faster. Of course, the crane should have enough power to lift heavy cargos.
[edit] Time limitations
In order to decrease the total cost, plan carefully when you are going to need a crane and how long it will be operational. In this way, you will avoid overspending on hire costs. For example, a tower crane needs to be disassembled if moving location and many engineers forget to add moving time into the total hours the crane is present at the construction site. Planning is crucial when it comes to limiting the time crane is used.
[edit] Liability
Accidents can happen. Be sure to apply all security and safety measures to prevent accidents, but if they do occur, you need to know who is responsible. Even a simple fender bender of a mobile crane will need to be paid out. That is why signing a liability contract is a good idea. This way, you as the client and the crane operating company will know exactly who is liable for which part of the job.
[edit] The type of crane You need
Basically, what you need the crane for, where it will work, and for how long will determine the type of the crane to hire. Telescoping cranes and truck mounted cranes are useful for short jobs that last only a few hours. If you need cranes for industrial use then you need overhead cranes, like the ones you can see in ports carrying shipping containers. Finally, tower cranes are most versatile and most common in high-rises.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.