Bid evaluation
|
This article should be read alongside Tender evaluation.
A tender, or 'bid' is a submission made by a prospective supplier in response to an invitation to tender. It makes an offer for the supply of goods and/or services.
Bid evaluation is the process that takes place after the tender submission deadline. It involves the opening and examining of the bids to identify the preferred supplier(s) for the project. Negotiations may then be entered into with one or more suppliers, and the successful supplier awarded the contract.
NB: There may have been a pre-qualification process before bids were invited to reduce the number of potential tenders to those that are genuinely appropriate for the project,
Generally, bid evaluation will be carried out in accordance with evaluation criteria or a selection methodology specified in the invitation to tender. Criteria or other factors that were not included in the invitation to tender should not be used to evaluate bids, and ideally, the same evaluators should evaluate all bids.
Bidding parties should submit clear and well-organised bids, but nonetheless, a great deal of thoroughness is required in the bid evaluation process, to ensure that proposals are properly understood, bids are compliant with invitation to tender, no information is overlooked and that correct conclusions are reached.
An initial review of the offers received is generally undertaken to determine their responsiveness and conformity to the conditions in the invitation to tender documents. Non-compliant bids may be rejected (unless a compliant bid has also been submitted).
A more detailed evaluation of compliant bids may then be undertaken against a number of pass/fail criteria. A technical determination should be made to ascertain whether the bidder’s technical solution is feasible, appropriate and deliverable within certain requirements, i.e. safety and costs. If a consortium has submitted the bid, the proposed project management should be assessed to determine how cohesive it will be in terms of delivering the project.
See Tender evaluation for more information.
There are a number of criteria upon which a preferred bidder can be identified:
- Lowest price
- Most economically advantageous tender (MEAT)
- Mean value
- Exclusion of the extremes
See Contract award for more information.
While it is common for the lowest priced tender to be awarded the contract, other factors – such as relevant experience and the perceived quality of the solution – should also be taken into consideration, as the lowest price does not always result in the best long-term value.
It may be the case that after the initial review only one bid will be sufficiently compliant. The lack of compliance or lack of interest may be because of deficiencies in the tender documents. If this is the case, then the tender documents could be rectified and the tender procedure begun again.
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Best value procurement.
- Bidder.
- Bid writer.
- Competitive tender.
- Construction contract.
- Contract award.
- Contract conditions.
- Contract documents.
- Due diligence when selecting contractors or subcontractors.
- Invitation to tender.
- Letter of award.
- Mid-tender interview.
- Most Economically Advantageous Tender (MEAT).
- Pre-tender interview.
- Procurement route.
- Selection criteria.
- The benefits of e-procurement in construction.
- Tender documentation.
- Tender evaluation.
- Tender processes.
Featured articles and news
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.






















Comments
https://autocadfiles.com/amp/residential-house-apartment-design-in-autocad-file-download
Residential House apartment design in autocad file</a> Download file, Bed Room & other room architecture Furniture detail & all interior design, PArking lay-out & Side section & Stair detail.