Selection criteria
Selection criteria (sometimes referred to as award criteria or evaluation criteria) are lists of items against which a prospective supplier can be assessed before a selection is made and a contract awarded. They might also be used to help identify suitable individuals when seeking new employees.
Defining specific selection criteria can help an employer agree among themselves the characteristics that they value. This helps ensure they identify the best value submission, rather than simply the lowest price submission. When the employer is evaluating submissions, referring to the selection criteria, or perhaps even giving marks against each criteria can help focus the assessment and prevent it being dominated by personal preferences or by forceful individuals.
Informing applicants what the selection criteria are can create a fairer process, enabling applicants to consider in advance whether they are suitable, and helping them tailor their submissions. It also makes the application process more transparent and so less open to challenge.
Assessment criteria will vary significantly depending on the nature of the role; whether it is for a consultant, contractor, other supplier or employee, however, some typical criteria might include:
- Price.
- Relevant experience.
- Understanding of the requirements.
- Past performance.
- Technical skills.
- Availability.
- Management skills.
- Proposed methodology.
- Compliance with the requirements of the submission process.
- Financial standing.
The criteria may be weighted to reflect how important they are to the client. Each submission is then given a score against each criteria. Submissions might be scored by a number of assessors, or different assessor might score different criteria.
The overall score for a submission can be calculated by multiplying the score for each criteria by its weighting and then adding together or averaging the results for each assessor. Where there are very different scores between assessors, a meeting might be held to discuss the reasons.
More complex assessments might include additional benchmarks. For example, there may be certain criteria that are straight-forward pass/fail issues. There may also be criteria for which a very low rating is unacceptable irrespective of scores for other criteria.
[edit] Related articles on Designing Buildings Wiki
- Accelerated debrief.
- Adversarial behaviour in the UK construction industry.
- Appointing consultants.
- Auction theory.
- Best value.
- Best value procurement.
- Bid evaluation.
- Competitive procedure with negotiation.
- Due diligence when selecting contractors or subcontractors.
- Innovative partnership procedure.
- Invitation to tender.
- Most Economically Advantageous Tender (MEAT).
- Pre qualification questionnaire.
- Procurement route.
- Tender evaluation.
- Tender price appraisal.
- The benefits of e-procurement in construction.
Featured articles and news
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.






















