Tender price appraisal in the construction industry
Contents |
[edit] Introduction
A tender is a submission made by a prospective supplier in response to an invitation to tender (ITT). It makes an offer for the supply of goods and/or services. An invitation to tender might be issued for a range of contracts, including; equipment supply, the main construction contract (perhaps including design by the contractor), demolition, enabling works, and so on.
Once tenders have been received, a thorough process of assessment is undertaken to identify the preferred tenderer. The tender pricing document is a key aspect of the tender return that will be assessed by the cost consultant to determine where value lies within the different tenders and to enable a like for like comparison between tenderer prices.
[edit] Preparation
To ensure a like for like comparison, the tender consultants need to ensure that a standard format is completed by all tenderers. The format of the document can be different depending on the form of contract selected.
Examples of pricing formats include:
- Bill of quantities (with quantities).
- Bill of quantities (without quantities).
- Schedule of rates.
- Contract sum analysis.
- Any other bespoke template formulated by the tender consultants.
[edit] Assessment
The tender price assessment will commence once all tenders have been received and opened and reviewed for compliance. Non-compliant tenders may be excluded unless they were specifically permitted in the invitation to tender.
The pricing comparison will then be carried out by a cost consultant. The cost consultant will use their own benchmark document to compare the tender prices against.
The assessment will enable the consultant to:
- Provide a like-for-like comparison between tenderers and the cost plan (benchmark).
- Assess value for money.
- Check arithmetic.
- Identify significant differences in pricing to ensure tenderers have interpreted the specification correctly.
- Identify potential areas of savings that can be negotiated with the tenderers.
- Review rate distribution (ensure that the tenderers have not front loaded the project).
- Prepare a tender report.
[edit] Review and action
Arithmetical errors will need to be reviewed in accordance with the tender guidance rules. Government contracts might have strict guidance on the correction of errors and disallow contract sum changes. The private sector might be more lenient and allow price reduction corrections. It is important to capture any changes and confirm this in writing and keep records of any communication.
Any other areas of qualification by tenderers must also be assessed. Tenderers might add qualifications to their price that will influence the contact sum. An example is a clarification that might limit the tenderers price to only a certain depth when it comes to excavations.
Any other big price discrepancies should be highlighted and reviewed. If a price is too low it can also be a risk to the project. The project can become a financial burden on the tenderer and they are unlikely to perform satisfactorily. The cost consultant will have to assess the reason for the low price. If it is due to misinterpretation of the design or low wages, it can have an impact on the outcome of the project. It is important to distinguish between a legitimate keen commercial price and a non-compliant tenderer price.
The cost consultant will provide a summary of the cost assessment and conclude with a contract sum that will form part of the tender report and subsequently become part of the contractual documents.
However, the tenderer with the lowest price may not necessarily be awarded the contract, as other criteria such as experience, availability, value for money and so on may also be considered. For more information see: Selection criteria.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.