Selection criteria
Selection criteria (sometimes referred to as award criteria or evaluation criteria) are lists of items against which a prospective supplier can be assessed before a selection is made and a contract awarded. They might also be used to help identify suitable individuals when seeking new employees.
Defining specific selection criteria can help an employer agree among themselves the characteristics that they value. This helps ensure they identify the best value submission, rather than simply the lowest price submission. When the employer is evaluating submissions, referring to the selection criteria, or perhaps even giving marks against each criteria can help focus the assessment and prevent it being dominated by personal preferences or by forceful individuals.
Informing applicants what the selection criteria are can create a fairer process, enabling applicants to consider in advance whether they are suitable, and helping them tailor their submissions. It also makes the application process more transparent and so less open to challenge.
Assessment criteria will vary significantly depending on the nature of the role; whether it is for a consultant, contractor, other supplier or employee, however, some typical criteria might include:
- Price.
- Relevant experience.
- Understanding of the requirements.
- Past performance.
- Technical skills.
- Availability.
- Management skills.
- Proposed methodology.
- Compliance with the requirements of the submission process.
- Financial standing.
The criteria may be weighted to reflect how important they are to the client. Each submission is then given a score against each criteria. Submissions might be scored by a number of assessors, or different assessor might score different criteria.
The overall score for a submission can be calculated by multiplying the score for each criteria by its weighting and then adding together or averaging the results for each assessor. Where there are very different scores between assessors, a meeting might be held to discuss the reasons.
More complex assessments might include additional benchmarks. For example, there may be certain criteria that are straight-forward pass/fail issues. There may also be criteria for which a very low rating is unacceptable irrespective of scores for other criteria.
[edit] Related articles on Designing Buildings Wiki
- Accelerated debrief.
- Adversarial behaviour in the UK construction industry.
- Appointing consultants.
- Auction theory.
- Best value.
- Best value procurement.
- Bid evaluation.
- Competitive procedure with negotiation.
- Due diligence when selecting contractors or subcontractors.
- Innovative partnership procedure.
- Invitation to tender.
- Most Economically Advantageous Tender (MEAT).
- Pre qualification questionnaire.
- Procurement route.
- Tender evaluation.
- Tender price appraisal.
- The benefits of e-procurement in construction.
Featured articles and news
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.
Put digitalisation and sustainability at the core of curricula
Project management educators are urged.
Looking back at the influence of climate events
From a designer and writer: 'There are limits to growth but no limits to development'.
Terms, histories, theories and practice.
Biophilic design and natural light
Letting in the light and natural elements into spaces.
APM Programme Management Conference 2024
Strategies for Success.
Residential takes the reins as contract awards even out
Contracts down, but remain above the last quarter of 2023.
Celebrating Eid and the largest mud-brick building.
Barry Kingscote claims prestigious CIOB CMYA Award.
The British Mosque: an architectural and social history
The story of some 1,500 mosques or more in Britain.
Heat pump refrigerants, efficiencies and impacts
R12 to R1270 what are the differences?
Global heat pump market in 2023
Challenging times with positive but modest outlook.
Beyond the infrastructure pipeline
Opportunities and chokepoints.