Wuhan Hospital, China
Images of a timelapse were spread all over social media and news outlets in February 2020 as China built a new hospital facility in around 2 weeks 'from scratch'. News outlets reported that the facility has around a 1,000-bed capacity and was designed, procured and built-in this timescale.
It is more likely that the hospital facility is part of a larger state-run emergency action plan which has been sitting designed on a shelf especially for such an event after the last SARs virus outbreak in China.
Regardless if the modular unit construction or design is included in the timescale, it is still an amazing feat to build such a scale of off-site modular building in such a short space of time, and questions are now being asked about why this is not being implemented across the construction industry. The concept is not new, and the Egan Report and Latham report both attempted to resolve issues with wastage in the construction industry.
Further studies will no doubt be carried out on the back of these buildings construction timescales to see what lessons can be learned to improve construction timescales globally.
[edit] Related articles on Designing Buildings Wiki
- Cancer Centre at Guy's Hospital
- Conserving Ruchill Hospital water tower
- Fountaine Hospital Almshouse
- How a Complex Hospital Building for Orthopaedic Services was Constructed in Less Than Four Months
- How to Develop the Most Constrained Hospital Sites to Reduce Waiting Times and Improve Patient Care
- Khoo Teck Puat Hospital
- North Middlesex University Hospital Maternity Unit
- Researching the history of Fountaine Hospital Almshouse
- Sea Sand Tower Hospital Queen Elizabeth, Kota Kinabalu, Malaysia
Featured articles and news
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.