Cost information
In the construction industry the term ‘cost’ generally refers to the amount that has to (or will have to) be paid to receive goods or services. Different types of cost include capital costs, construction costs, operational costs, whole-life costs, environmental costs, social costs and so on.
Cost information is an important element across several activities that are involved in cost engineering (the practice of managing costs involved on a construction project), such as cost control, budgeting, forecasting, estimating, investment appraisal and risk analysis. It is also used to help measure profit margins, value assets and make decisions.
The type of cost information will depend on the particular type of costs that are being managed.
In relation to construction costs, cost information can be used to help set prices, which are typically the actual cost plus a percentage to allow for profit.
In the context of estimating construction or capital costs, cost information should be aligned with the project budget and can be set out in cost plans. These are generally prepared by cost consultants (often quantity surveyors) and evolve through the life of the project, developing in detail and accuracy as more information becomes available about the nature of the design, and then actual prices are provided by specialist contractors, contractors and suppliers.
Types of cost plan include:
- Initial cost appraisal (studies of options prepared during the feasibility study stage).
- Elemental cost plan (prepared during the project brief stage and carried through to detailed design).
- Approximate quantities cost plan (from the end of detailed design through to tender).
- Pre-tender estimate (prepared alongside tender documentation).
- Tender pricing document (strictly speaking this is not a priced document, but is part of the tender documentation issued to the contractor for pricing).
- Contract sum (agreed with the contractor during the tender period and adjusted during the construction period).
- Contract sum analysis (a break down of the contract sum prepared by the contractor on design and build projects).
- Final account (agreed during the defects liability period).
For more information see: Cost plan.
Cost reporting is the process of providing a client (or other party) with information about the magnitude of a project’s predicted, or actual cost. This can be expressed either in absolute terms or as a variance compared to the project budget. Cost reports are typically prepared by a cost consultant (such as a quantity surveyor) and updated regularly (perhaps monthly), to keep the client informed and to help them and the project team control costs.
BCIS is the Building Cost Information Service of the Royal Institution of Chartered Surveyors (RICS). Cost and price information is collected by BCIS from across the UK construction industry, then collated, analysed, modelled, interpreted and made available to the industry to facilitate accurate cost planning.
For more information see: BCIS
NB The RIBA Plan of Work 2013 defines cost information as: 'All of the project costs, including the cost estimate and life cycle costs where required.'
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.