Site meeting
Site meetings are an important part of the successful management of construction projects. Regular site meetings between the different stakeholders on a project can help facilitate better communication and a shared sense of purpose making it more likely that the project is completed successfully. Project failures are often attributed to inadequate management, with a key factor being a lack of proper communication.
Meetings should be regular and formerly scheduled, perhaps on a weekly or monthly basis depending on the parties involved, although the size and complexity of the project may necessitate a more regular schedule. They are used as a means of reporting progress, enabling discussion of any problems or issues, and allowing the proposal of solutions. They provide a good opportunity for two-way discussions of any issues that have arisen or that are anticipated.
Holding meetings on site enables the stakeholders to see progress for themselves (rather than relying on a report for another party), and to look at problem areas, discuss quality issues, assess mock-ups, and so on.
Construction progress meetings are a specific sort of site meeting during which the contract administrator receives progress reports from the contractor and consultant team, cost reports from the cost consultant and other more specific information such as sub-contractor reports, progress photos, and so on.
In order to be able to provide the correct information at construction progress meetings, the contractor may previously hold a progress meeting with sub-contractors sometimes called a production meeting.
Meeting minutes should be prepared, with a requirement that any disagreement with the items recorded in the minutes is raised within a pre-defined period (perhaps one week). Progress meetings may also result in the preparation of a construction progress report for the client.
On construction management projects, the construction manager holds regular construction progress meetings with trade contractors to discuss on and off-site progress against the programme and to co-ordinate the release of information. It may sometimes be appropriate for these meetings to take place at the trade contractor's premises. On large projects the construction manager may hold a daily logistic meeting on site with trade contractor foremen to organise, schedule and co-ordinate on-site shared services such as deliveries and off-loading, hoists and cranage, scaffolding, safety issues, rubbish clearance etc.
Similar meetings may be held on management contract projects between the management contractor and the works contractors.
Other meetings held on site might include safety briefings and toolbox talks which are held to ensure that workers properly consider health and safety issues on site.
[edit] Related articles on Designing Buildings
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.























Comments