Safety audit
Buildings can present a great number of risks, both in construction and operation. The Health and Safety Executive (HSE) estimate that around 4% of construction workers suffer from a work-related illness every year, and 3% sustain a work-related injury. This results in around 2.2 million working days being lost each year.
Safety audits are carried out to assess health and safety processes on construction sites, considering; legislative requirements, industry best practice, and the contractor’s own health and safety management syst.
They can demonstrate that a proactive approach is being taken to safety, can help to improve ways of working and ensure procedures are being followed, as well as demonstrating compliance with regulations such as the Construction (Design and Management) Regulations 2015, which require reasonable steps are taken to ensure the health and safety arrangements made for managing the project are maintained and reviewed throughout a project.
Regular audits can form a crucial part of the project management process, and may be undertaken by in-house personnel, or by an independent auditing body.
Some of the issues that might be assessed during a safety audit include:
- Notices and signage are appropriate and in place, clear and visible.
- Zones and activities are effectively separated from one another.
- Access routes and walkways are well demarcated.
- Hazardous substances are properly contained.
- A health and safety plan is in place.
- First aid equipment and first aiders are available.
- There are processes for reporting accidents on site and near misses, and learning from issues that emerge.
- There is an effective emergency strategy in place.
- Evacuation routes are in place.
- Workers are provided with the appropriate personal protective equipment (PPE).
- There are appropriate welfare facilities.
- There is provision in place for safety training, such as site inductions, toolbox talks, safety briefings and so on.
- The site boundary is secure.
- There is appropriate lighting and security measures in place.
- The site is relatively clear of debris and materials are appropriately stored.
- Management systems are in place to ensure that duties under CDM are fulfilled.
- The Health and safety file is accurate and up-to-date.
- Subcontractors are conforming to the health and safety requirments of the main contractor.
Safety audits differ from safety inspections in that they are organised at the discretion of the client or contractor, rather than being undertaken without notice by the Health and Safety Executive (HSE).
[edit] Related articles on Designing Buildings
- Accident report.
- Automated external defibrillator AED.
- CDM.
- Construction site inspection.
- Emergency plan.
- Facilities management audit FMA.
- First aider.
- Health and Safety Executive.
- Health and safety inspector.
- Health and safety plan.
- Incident reporting system.
- Risk assessment.
- Safety management.
- Scaffold register.
- Site information for design and construction.
- Site inspector.
[edit] External references
Featured articles and news
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.