A Party Wall Surveyor specialises in resolving Party Wall Disputes that may arise under the Party Wall etc. Act 1996.
Under the Act and within England and Wales, disputes can arise between homeowners who directly share a wall, often referred to as a Party Wall, or when homeowners are in close proximity to each other and building works such as a structural works to the Party Wall, rear or side extension, or basement conversion are taking place.
There are no specific qualifications that are required to be appointed as a Party Wall Surveyor, however, Section 20 of the Act confirms: “surveyor” means any person not being a party to the matter appointed or selected under section 10 to determine disputes in accordance with the procedures set out in this Act
This effectively means that anyone can be a Party Wall Surveyor as long as they are not a party to the works.
[edit] Party wall procedures
The first step of the Party Wall procedure is for the building owner to serve a Party Wall Notice upon the adjoining owner if the building works they are carrying out is “notifiable” under the Party Wall etc. Act 1996.
The Party Wall Notice notifies the adjoining owners of the building owner’s proposed works and prompts them for a response. Under the Party Wall etc Act 1996, it isn’t necessary to have a Party Wall Surveyor serve the Party Wall Notice, this can be done by the building owner, however, it can be recommended that a Party Wall Surveyor does this as it will avoid invalid service which may cause delays.
Once an adjoining owner receives the Party Wall Notice, they can respond with one of the three following options:
- Consenting to the works (with or without a Schedule of Condition report)
- Dissenting to the Party Wall Notice and appointing their own Party Wall Surveyor
- Dissenting to the Party Wall Notice and agreeing to the appointment of an Agreed Surveyor. An Agreed Surveyor means that one Party Wall Surveyor acts impartially on behalf of the building owner and the adjoining owner.
[edit] Consenting to the works
Consenting to the Party Wall Notice essentially reserves the adjoining owner’s rights to be protected under the Party Wall etc Act 1996, therefore the further review and input of a Party Wall Surveyor will not be required.
If the adjoining owners consent and request that a Schedule of Condition Report is prepared, the Party Wall Surveyor will carry out the inspection of the adjoining owner’s property and then later compile the report. Once this report is complete, the building owner is free to go ahead and undertake with the works.
[edit] Dissenting and appointing their own party wall surveyor
If the adjoining owner decides to dissent to the Party Wall Notice and appoints their own Party Wall Surveyor, then the building owner’s Party Wall Surveyor will have to prepare a Schedule of Condition Report alongside the adjoining owner’s Party Wall Surveyor.
The adjoining owner’s Party Wall Surveyor will cross-check the Schedule of Condition Report to ensure it is accurate and fair and then proceed to agree a Party Wall Award (commonly referred to as a Party Wall Agreement) which includes governing the notifiable works.
[edit] Dissenting and agreeing in the appointment of an agreed surveyor
Dissenting to the Party Wall Notice and agreeing to the appointment of an Agreed Surveyor simply means that the adjoining owner who the Party Wall Notice was served upon has agreed for their Party Wall Surveyor to be mutually appointed by the building owner.
The Party Wall Surveyor, in this case, would then proceed to carry out the Schedule of Condition Report of the adjoining owner’s property and then draft and serve a Party Wall Award that will govern the works.
[edit] After the works are complete
Once the building owner’s works are complete the Party Wall Surveyor is able to carry out a check-off inspection. At this time the Party Wall Surveyor will look at the original Schedule of Condition Report and cross-check the condition of the property to ensure there are no areas of damage or other issues.
If there is damage, the Party Wall Surveyor can ask the building owner to either, make good the damage, or provide the adjoining owner with compensation so they can instruct their own contractor to make good.
Related articles on Designing Buildings Wiki
- Adjoining buildings definition.
- Appointing consultants.
- Basement excavation.
- Building an extension.
- Fence.
- Line of junction notice.
- Load-bearing wall.
- Neighbour.
- Party structure notice.
- Paerty wall act.
- Party wall surveyor.
- Preventing wall collapse.
- Responsibility for boundary features.
- Right of support.
- Statutory approvals.
- Statutory authorities.
- Trespass.
- Wall types.
- What approvals are needed before construction begins.
- Who Pays for Party Wall Surveyor's Fees?
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Guide to ISO 19650 for Architecture Firms (2026)
A user gives their low down.
A UK training and membership provider for mould remediation professionals.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
Independent NSI and BAFE study exploring how organisations are changing the way they buy fire safety services.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.