Schedule of condition of property
Contents |
[edit] Introduction
A schedule of condition (SOC) is a factual record of the condition of a property, normally prepared for legal or contractual reasons. Schedules of condition can be prepared for either residential or commercial buildings.
They create a complete record of the condition of the property on a particular date that can be used as a benchmark against which its condition can be assessed in the future and any changes identified.
Schedules of condition may be prepared under the instruction of a landlord, a tenant, an employer, a contractor, or a neighbour. Appointing an independent expert to prepare a schedule of condition should help to give it greater weight if there are subsequent claims or negotiations. It may be beneficial to seek agreement of the other party that the schedule is a fair reflection of the condition of the property when it is prepared.
It is important to recognise that identifying a change in the condition of a property does not necessarily attribute blame for that change.
[edit] Leases
For commercial or residential property leases, a schedule of condition can be required when a new lease is entered into to confirm the condition of the property. This ensures that the condition recorded so that any existing defects and their repair costs are identified prior to a commitment to lease being made, and can help with lease negotiation. It can also be used to establish responsibility for dilapidations and reinstatement, typically towards the end of a lease.
[edit] Construction
A schedule of conditions might be prepared before construction begins for adjacent properties or structures that will be retained, or if part of a building is being refurbished. This not only helps protect against potential claims from neighbours, who may only begin to notice pre-existing defects in their property when the noise and vibration of construction begins, but can also establish contractor liability for damage to the employer’s properties.
[edit] Party walls
For both commercial and residential properties, a schedule of condition can be prepared where the Party Wall etc. Act 1996 applies. This is to provide evidence of the condition of the neighbouring building prior to works beginning. The party wall surveyors can then undertake a re-inspection of the building and determine whether any damage has occurred and also what repairs should be carried out.
[edit] Contents
Typically, schedules of condition are prepared by surveyors and may comprise:
- The purpose of the schedule.
- Details of the location and extent of the property being assessed.
- A general description of the construction of the property.
- The time, date and weather conditions under which the inspection was made.
- Aspects of the property included in or excluded from the assessment.
- The purposes for which the schedule may be relied.
- Drawings of the property.
- Definitions (for example, ‘slight’, ‘moderate’ and ‘severe’).
- A written schedule setting out the location and nature of each item inspected (inside and out) and its condition and any other remarks. This will describe the overall condition and may identify existing issues, such as cracks, staining, holes, decay, discolouration, leaks and other defects, disrepair or deterioration
- Accompanying photographs and video.
- Specific tests that may have been carried out.
[edit] Related articles on Designing Buildings Wiki
- Betterment.
- Condition.
- Defects.
- Dilapidations.
- Homes (Fitness for Human Habitation) Act 2018.
- Mobilisation.
- Party wall act.
- Schedule.
- Schedule of defects.
- Schedule of dilapidations.
- Scott schedule.
- Supersession.
- Three party wall notice responses.
[edit] External references
Featured articles and news
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.



























Comments