Off-site construction
The phrase 'off-site construction' (sometimes referred to as industrialised building) refers to the completion of elements or components of a construction project at a different location to where they will be permanently installed. Typically, this can involve planning, design, fabrication and assembly in purpose-built off-site factories. The completed item is then transported to site and assembled in place.
Off-site locations may be permanent manufacturing facilities, or 'flying factories', that is, temporary facilities that operate for the duration of a project and then 'fly' to a new location to service another project.
Off-site construction is often referred to as 'prefabrication', 'off-site manufacture' or 'modern methods of construction', and it may involve modular construction. It is most commonly concerned with permanent structures rather than temporary or relocatable structures.
Mark Farmer's 2017 report 'Modernise or die' adopted the term 'pre-manufacture' as '...a generic term to embrace all processes which reduce the level of on-site labour intensity and delivery risk', and suggested that this could range from '...component level standardisation and lean processes through to completely pre-finished volumetric solutions'.
Off-site construction has increasingly been promoted as a solution to many of the problems facing the UK construction industry. This is because of the significant time-efficiencies that can be achieved through using off-site techniques, as well as better safety, reduced waste, higher quality, reduced down time and so on.
Off-site construction is particularly suited to high-volume, repetitive components, or products that require factory conditions to achieve the desired level of quality. It is widely considered that housing should be an obvious target for off-site construction.
However, the initial set-up costs can be high, and it can be difficult to maintain a sufficiently consistent pipeline of demand to suit assembly line production methods. Transport costs can also be high. In addition, there have been lingering concerns regarding the label 'prefabricated' as a result of poor-quality mass-produced housing that was pre-fabricated following the second world war, as well as the Ronan Point collapse in 1968.
Modernise or die looked forward to a fourth industrial revolution underpinned by cyber-physical ‘smart’ production techniques, which it described as 'Industry 4.0’. However, it acknowledged that in many respects, construction has yet to achieve ‘Industry 3.0’ status, which would simply require large scale use of electronics and IT to automate production.
[edit] Related articles on Designing Buildings
- Advanced manufacturing.
- BSRIA launches Offsite Construction for Building Services topic guide.
- Construction problems avoided by using a modular approach.
- Design for Manufacture and Assembly (DfMA).
- Flying factory for construction works.
- In situ.
- Modern methods of construction.
- Modular buildings.
- Modular construction market report 2020-2026.
- Off site materials.
- Off-site manufacturing.
- Offsite manufacturing and standardised design.
- Off-site manufacture for construction: Building for change.
- Off site, on track.
- Off-site prefabrication of buildings: A guide to connection choices.
- Prefabrication.
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.