Goods received note GRN
Goods received note (GRN) is a document that acknowledges the delivery of goods to a customer by a supplier and confirms that the goods have been received in a suitable condition by the customer. They may be internally generated by the customer as a project record or be a joint document between customer and supplier and form part of logistics in construction.
A delivery note or Proof of Delivery (POD) may refer to the same document, acting for both purposes but is usually produced by the supplier and acknowledged by the customer, in the case of a construction site, often a particular individual. These documents differ from Goods Despatched Notes (GDN) which are merely supplier documents confirming that a delivery has been shipped from its manufacturing base or warehouse.
A GRN is the record of goods that the buyer has received, and normally contains a description of the goods, the quantity of good, the date of delivery and the individual who inspected the goods. It used by the buyer to compare the goods ordered to those delivered, and is normally completed following a brief inspection of the items, their condition and number. It is then retained to compare to the supplier invoices or purchase orders for a particular project as well as the bills of quantities.
The information in the collected GRN's can also become significant as a body of information for contractual purposes in relating the contractor performance to that of the agreed construction programme or agreed costs. These can become especially important in scenarios where damaged goods or late deliveries have knock on effects causing programme or completion delays that have cost implications.
GRNs may also increasingly be used as evidence requirements for building or site environmental performance assessments, confirming the materials actually used in a building project, for example assessing product and site emissions, known as cradle to gate and gate to site emissions. They may also be a key part of any waste reduction programme both from the perspective of the over ordering of materials but also in terms of waste packaging.
[edit] Related articles on Designing Buildings
- BSI construction product identification system.
- Call-off contract.
- Construction buyer.
- Construction consolidation centre (CCC).
- Construction inventory management.
- Construction logistics manager.
- Construction logistics plan.
- Construction Logistics and Community Safety.
- Fleet operator.
- Fleet Operator Recognition Scheme.
- Forward-logistics.
- How to manage construction plant.
- Inventory.
- Lean construction.
- Lean construction - a quality perspective.
- Logistics data.
- Materials on site.
- Off site materials.
- Programme for building design and construction.
- Resource management.
- Reverse-logistics.
- Scheduling construction activities.
- Site logistics.
- Site storage.
- Supply chain management.
- Understanding agile in project management.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
























