Fabrication
|
In construction, a ‘fabrication’ is an item that is manufactured by a fabricator for installation on a building site as part of an ongoing construction project, for example, a window, door, steel member, staircase and so on that is typically made off-site to the specification required for the project.
A building’s windows are normally fabricated off-site to special dimensions that the fabricator has either taken off the drawings or specification, or else has visited the site and measured for the item to be supplied. The fabricator can then proceed to manufacture. It should be noted that a fabrication can be termed ‘prefabricated’ if it is made off site. Delivered to site ready to install means that these items can help reduce waste and time and cut emissions.
For more information see: Prefabrication.
In theory, it is possible for fabrications to be made on site (or in a flying factory) as opposed to off site, assuming the process is simple enough (e.g timber windows) and there is enough space on site to allow the fabrication process to take place. In most circumstances however, fabricating building elements can require complex machinery that requires the controlled conditions, accuracy and space offered by a manufacturing plant.
[edit] Related articles on Designing Buildings Wiki
- Concrete frame.
- Construction problems avoided by using a modular approach.
- Crosswall construction.
- Design for Manufacture and Assembly (DfMA).
- Modular buildings.
- Offsite manufacturing.
- Off-site construction.
- Off site, on track.
- Prefabrication.
- Stainless steel.
- Steel frame.
- Structure relocation.
- The overlooked secret of off-site fabrication.
Featured articles and news
Tackle the decline in Welsh electrical apprenticeships
ECA calls on political parties 100 days to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.























