Energy audit
Energy audits are undertaken to assess energy use and propose measures that might be taken to reduce consumption and costs.
The Carbon Trust suggest that 20% of business' annual energy costs are wasted by energy inefficient equipment, however, businesses often focus on revenue rather than costs and so 60% of cost-effective, viable, energy efficiency recommendations are not implemented. (Ref Carbon Trust, Mandatory energy efficiency audits for business. December 2013.)
An energy audit might be undertaken for a single building, several buildings, a site or an organisation, and might be carried out for commercial or domestic clients.
An energy audit might provide:
- An assessment of energy consumption and carbon emissions.
- A comparison with previous audits.
- Benchmarking against similar buildings.
- Assessment in relation to corporate energy targets or policies.
- A schedule of energy savings that could be made.
- An Investment appraisal of proposed measures including pay-back periods.
- An assessment of the difficulty of implementation.
- Prioritisation of measures.
- Proposed changes to operations, staff behaviour, communications, training and so on.
- Potential suppliers.
- Financing options.
Typically, savings might be identified through assessment of:
- Whether buildings are being operated properly (in accordance with the intention of the original design). For example, occupants opening windows in air-conditioned buildings.
- Whether changes been made since buildings were completed prevent them from operating properly (such as changes to plant during repairs or servicing).
- The type of lighting.
- Type and management of heating and cooling.
- Thermal comfort.
- Monitoring systems, timers, controls, sensors and other devices.
- Industrial processes, plant, equipment and machinery.
- Building fabric, heat loss, air-tightness and insulation.
- Type of energy used and tariff.
- Potential to use low-carbon or renewable energy.
- Potential for on-site energy generation.
- Possible behavioral changes.
- Assessment of other issues such as; water consumption, waste streams and transport.
Energy audits can be carried out in-house if there is sufficient expertise, or external advisers (such as energy surveyors) may be appointed. Organisations such as the Carbon Trust provide accreditation for energy surveyors.
Article 8 of the European Union (EU) Energy Efficiency Directive (2012/27/EU), requires that member states introduce regular energy audits for large enterprises with more than 250 employees or a turnover exceeding €50m (ie enterprises other than small and medium-sized enterprises (SMEs)). This is intended to encourage the uptake of cost-effective energy efficiency measures. These audits must be undertaken by 5 December 2015, and then every four years after that. The scheme does not extend to public bodies and does not require businesses implement the energy saving recommendations.
In the UK , the government propose that the directive should be implemented through the Energy Savings Opportunity Scheme (ESOS). See Energy Savings Opportunity Scheme for more information.
See also: Energy-use audits of buildings.
[edit] Related articles on Designing Buildings
- Air permeability testing.
- Air tightness in buildings
- BREEAM.
- BREEAM Testing and inspecting building fabric.
- Building use studies (BUS).
- Climate Change Act.
- Code for sustainable homes.
- Draughts in buildings.
- Emission rates.
- Energy management in the built environment: A review of best practice.
- Energy performance certificates.
- Energy Savings Opportunity Scheme.
- Energy targets.
- Energy-use audits of buildings.
- Leadership in Energy and Environmental Design.
- Thermographic survey.
[edit] External references
- Department of Energy & Climate Change, Energy Savings Opportunity Scheme.
- Energy.gov, Home energy audits. USA.
- Business Green, DECC urges businesses to seize opportunity offered by new energy audit rules.
- Carbon Trust, Mandatory energy efficiency audits for business. December 2013.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.























Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.