Cesspool
A cesspool is an underground tank used to collect wastewater and sewage. It will typically have a manhole for access, but does not have an outlet and does not discharge any of its contents. Unlike a septic tank, a cesspool does not process or treat wastewater and sewage it simply stores it.
Cesspools are sometimes referred to as cesspits, although both terms can also be used to refer to a underground chamber that is not sealed at the bottom so as to allow liquid to seep into the surrounding ground (commonly referred to as a soak pit). This has not been permitted since the introduction of the Public Health Act 1936.
Cesspools should be inspected fortnightly and the level checked (an automatic alarm may be installed). The contents of the cesspool must be removed regularly (typically every month depending on size and usage – much more frequently than an equivalent septic tank) by a licensed waste handler using a vacuum tanker. This can be a significant expense.
Cesspools are generally only installed at properties that are not connected to the public sewer network and that do not have suitable ground to provide a septic drain field (required for the installation of a septic tank), or at locations such as campsites where chemical toilets are emptied that might prevent a septic tank from functioning correctly.
Permits are not required for cesspools, and they do not have to comply with the general binding rules that apply to septic tanks. However, planning permission and building regulations approval is needed to install a cesspool.
Requirements for the design, construction and maintenance of cesspools are set out in Approved Document H of the building regulations, which permits cesspools were the installation of a septic tank is not reasonably practicable.
Cesspools should be at least 7m from habitable parts of a building, preferably downslope, and must be adequately ventilated. They should be within 30m of vehiclular access. They should have a capacity of at least 18,000 litres for two users and a further 6,800 litres for each additional user. A filling rate of 150 litres per person per day is assumed when estimating filling rates.
A durable notice must be fixed in the building associated with the cesspool, providing information about its maintenance.
Cesspools are generally manufactured from glass reinforced plastic, polyethylene or steel, or constructed from brickwork or concrete. Older cesspools of masonry construction may have deteriorated over time, resulting in leaks or weaknesses that can lead to collapse. Cesspools should be inspected periodically by a suitably qualified engineer to ensure they remain sound.
If a cesspool does not fill as quickly as expected, or if the level suddenly drops, it should be inspected for possible leaks. Allowing a cesspool to overflow or leak is an offence under the Public Health Act 1936, and allowing a cesspool to pollute a watercourse is an offence under the Water Recourses Act 1991.
[edit] Related articles on Designing Buildings Wiki
- Air admittance valve.
- Approved Document H.
- Difference between drains and sewers.
- Drainage stack.
- Drainage.
- Drains.
- Grease management.
- Miasma theory.
- Plumbing.
- Private sewer.
- Public sewer.
- Safe working in drains and sewers.
- Sanitary pipework.
- Sanitaryware.
- Section 102 existing sewer adoption.
- Section 104 new sewer adoption.
- Septic tank
- Sewer.
- Soil vent pipe.
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).