BREEAM Reduction of energy use and carbon emissions
Contents |
[edit] Aim and benefits
This issue rates how well buildings have minimised energy demand, primary energy consumption and CO2 emissions. It only covers regulated energy (pre-2018), and so excludes external lighting, small power, and specialist equipment.
The aim of this credit is to encourage designers to take a holistic view to an efficient energy strategy in a building, rather than solely reducing energy (ENE 4 Passive Design) or replacing fossil fuels with renewables (ENE 4 LZC Feasibility).
This issue offers the following potential benefits to end users and clients:
- A higher EPC (for developments assessed under BREEAM 2008 or earlier) or Energy Performance Ratio (for development assessed under BREEAM 2011 or later) can lead to reduced runnning costs / energy bills and a lower carbon footprint over the life of the development;
- Facility for brand imaging / marketing of sustainability credentials;
- Increased building life before becoming obsolete; and
- Longer retention of tenants and higher yields.
[edit] What's the difference between the ENE 1 credits scored and Part L?
Part L is concerned solely with reducing CO2 emissions from a building. While there are limiting factors (e.g. minimum fabric efficiencies), it is entirely plausible to have a building that uses a large quantity of energy but off sets it all with renewables to comply with building regs.
ENE 01 balances reducing operational energy demand, primary energy consumption and CO2 emissions to give an "Energy Performance Ratio". The three graphs below show the the energy performance ratio given for each of these three elements for the percentage improvement over a notional building as read from the BRUKL compliance report. These figures apply to ENGLAND ONLY. This varies per country to account for the fact that some country's building regulations are more stringent than others.
The EPR for each element, is then added up to give an overall EPR which is compared to the ENE 01 credits table in the BREEAM manual. The ENE 01 calculator/scoring and reporting tool does this all for you, but sometimes it's handy to know the background. A spreadsheet has been included in the tools and resources section which contains the above graphs, if you find it helpful to get your head around the calculation.
As always, please only use official, up to date, BREEAM tools for calculating credit requirements etc.
So, as an example, if you have a building that uses a lot of energy for building services and doesn't have especially efficient fabric (e.g. only just meets building regulations for Primary Energy Consumption and Energy Demand), then the maximum credits you can get, regardless of how much energy offset by renewables is 5 UK New Construction 2014 credits. Note, in previous schemes additional requirements may mean 5 credits are not achieved.
[edit] When to consider
In the UK, RIBA Stages typically guide when things get done on a project. Standard RIBA Stage deliverables are as follows:
[edit] RIBA Stage 0 and 1
These stages are "Strategic Definition" and "Preparation of Brief". It's unlikely you'll get any solid information during these stages regarding credit targets. However, if your client has said that energy efficiency is a main priority for the project, you can probably assume you'll achieve more credits than if they're happy to scrape through building regs.
[edit] RIBA Stage 2
This stage is "Concept Design". Standard RIBA Stage 2 deliverables at this stage include conduction an initial Part L appraisal. While this might not finalise the number of credits you'll actually achieve (there's a lot of design changes to go yet!), it should give you a reasonable idea.
[edit] RIBA Stage 3
"Developed Design". An interim Part L report is often a deliverable from this stage. This will give you a better idea of the number of design stage credits you'll achieve. This may be the final Part L design stage report you get, depending on whether there are further design changes during RIBA Stage 4.
[edit] RIBA Stage 4
"Technical Design". At this stage, a full "as designed" Part L report should have been produced, and submitted to building control for approval. The report which is submitted to building control is pretty "safe" to use as your design stage evidence, providing it meets all criteria etc.
[edit] RIBA Stage 5
"Construction". Try to keep an eye on design changes as best as possible. If there's anything big relating to building fabric, heating/cooling systems or renewables ask for confirmation that there is no effect on Part L from the engineers.
[edit] RIBA Stage 6
"Handover and Close Out". Typically expect the final "as built" Part L report within about 30 days of practical completion.
[edit] Step by step guidance
Awaiting content
[edit] Questions to ask while seeking compliance
Awaiting content
[edit] Tools and resources
Guidance note explaining ENE 01 Methodology
Spreadsheet helping to explain ENE 01 Methodology for ENGLAND
BRE Knowledge Base related articles
[edit] Tips and best practice
Tip: Don't assume that a lovely fully naturally ventilated building will score better than a glass mechanically ventilated sky scraper. This credit still relies on a percentage improvement against a notional building. So as long as your mechanically ventilated glass box is better than the notional mech vent glass box, you can still score well in this credit (albeit you may score lower elsewhere).
[edit] Typical evidence
Awaiting content
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
[edit] Find out more
Performance gap between building design and operation
Energy performance certificate EPC
Featured articles and news
50th Golden anniversary ECA Edmundson apprentice award
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
Construction contract awards down one billion pounds
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.