[edit] Overview
The Carbon Emissions Reduction Target (CERT) scheme ran between April 2008 and December 2012 following the Energy Efficiency Commitment 2005-2008. CERT placed a five year commitment on certain electricity and gas suppliers to reduce the carbon emissions within domestic properties.
The main aim of CERT was to contribute to the UK’s commitment to cut greenhouse gases by 12.5% by 2008-2012 under the Kyoto Protocol and Climate Change Act 2008. The overall target was for suppliers to achieve a saving of 293 million lifetime tonnes of carbon dioxide (Mt CO2) by 31 December 2012. By the end of CERT in December 2012, energy companies had achieved a saving of 296.9 Mt CO2 (Ofgem, 2013).
The CERT scheme was followed by The Gas and Electricity (Energy Companies Obligation) Order 2012 (the ECO).
[edit] Background
CERT was implemented by the Electricity and Gas (Carbon Emissions Reduction) Order 2008. Suppliers had to demonstrate that carbon dioxide (CO2) saving measures were being achieved through householders implementing energy efficiency measures.
The energy companies that were obliged to meet the reduction target were:
In addition to the carbon reduction target, the energy companies were required to meet the following three targets:
- At least 40% of the target had to be achieved through uptake by ‘Priority Group’ consumers. These were defined as those aged over 70 years of age or in receipt of certain income-related benefits.
- A saving of 16.2 Mt CO2 had to be met by promotion of energy efficient measures to the ‘Super Priority Group’ consumers. These were defined as those on certain qualifying benefits, for example households in receipt of child tax credits and under an income threshold.
- A saving of 73.4 Mt CO2 had to be met by promoting professionally installed insulation measures.
[edit] Delivery
Ofgem regulated the progress of CERT and reported that 3.9 million homes received professionally-installed loft insulation and 2.6 million households received cavity wall insulation. Other measures implemented included:
- Draught proofing and insulation.
- Shower regulators.
- Solar water heating.
- Small scale combined heat and power (CHP).
- Replacement boilers.
[edit] Scheme outcome
By end of the scheme in December 2012, the energy suppliers had achieved the following (Ref Ofgem, 2013):
- Savings of 296.9 Mt CO2 (equivalent to 101.3% of the overall CERT target). The main target required all the energy companies to meet their main obligations, but two failed and so the main target was not achieved.
- 41.3% of the overall carbon saving was from the Priority Group, against a target of 40%. The Priority Group target required that all energy companies had to meet their Priority Group obligations, but one did not so the target was not achieved.
- Saving of 16.6 Mt CO2 of carbon from the Super Priority Group, which is the equivalent of 102.6% of the 16.2 Mt CO2 target. In order to meet the Super Priority Group target, all energy companies had to meet their Super Priority Group obligations, but one did not so the Super Priority Group target was not met.
- Saving of 75.1 Mt CO2 of carbon (equivalent to 102.3% of the 73.4 Mt CO2 target) by installing measures eligible under the Insulation target. In order to meet the Insulation target, all energy companies had to meet their Insulation obligations, but two failed and so the Insulation target was not met
The majority of carbon saving was achieved through the installation of insulation measures (41%), with lighting measures accounting for 17.3%. Heating savings contributed 10%, appliances 5.9% and the remainder was split between microgeneration and CHP, behavioural measures and demonstration actions.
[edit] Related articles on Designing Buildings Wiki
- Carbon dioxide.
- Carbon emissions.
- Cavity wall insulation.
- Circular Construction in Regenerative Cities (CIRCuIT).
- Climate change act.
- Climate change levy.
- Combined heat and power.
- Green deal.
- Energy companies obligation.
- Insulation.
- Kyoto protocol.
[edit] External references
- The final report of the Carbon Emissions Reduction Target (CERT) 2008-2012, Ofgem 2013.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.