Airtightness Testing of Raised Access Plenum Floors (BTS 4/2024)
A raised access plenum floor is a void between a building’s floor structure and the occupied space. This BSRIA Test Standard provides a methodology for testing raised access plenum floors and states limiting criteria for leakage. It supersedes BG 65/2016 Floor Plenum Airtightness – Guidance and Testing Methodology.
In response to stakeholder feedback to enhance and simplify the guide, BG 65/2016 Floor Plenum Airtightness – Guidance and Testing Methodology was superseded in 2024 by a new BSRIA Test Standard.
A raised access plenum floor is a void between a building’s floor structure and the occupied space, used for distributing conditioned air to the spaces above, consisting of two elements; the underfloor void and raised access floor. It is important that conditioned air in a floor plenum flows into the occupied zone and does not leak into cavities, risers, stairwells, heating trenches or other adjacent zones. A properly sealed raised access plenum floor will allow the diffusers and grilles to fulfil their primary role of delivering air at the correct flow rate. The airtightness of raised access plenum floors can be a serious energy efficiency issue.
This BSRIA Test Standard provides a methodology for testing raised access plenum floors. Limiting criteria for leakage from the underfloor void and raised access floor are provided, tailored to the challenges of smaller floor areas. Guidance on achieving both is provided. The testing methodology has also been enhanced to offer a complete process, eliminating the need to consult additional standards.
Specifying BTS 4/2024 can support an effective air distribution solution that aligns with design intentions for operational performance.
Revision History:
- Withdrawn: BG 12/2010 Floor Void Airtightness – Air Leakage Specification
- Superseded: BG 65/2016 Floor Plenum Airtightness – Guidance and Testing Methodology
- Current: BTS 4/2024 Airtightness Testing of Raised Access Plenum Floors
This article appears on the BSRIA news / blog and bookshop site as 'Airtightness Testing of Raised Access Plenum Floors (BTS 4/2024)' dated 01 December, 2024.
--BSRIA
[edit] Related articles on designing Buildings
- Airbrick.
- BSRIA articles.
- Displacement ventilation.
- Dynamic thermal modelling of closed loop geothermal heat pump systems.
- Earth-to-air heat exchangers.
- Floating floor
- Floating floors in buildings..
- Geothermal energy.
- Geothermal pile foundations.
- Ground energy options
- Ground preconditioning of supply air.
- Ground source heat pumps.
- Plenum.
- Raised floor.
- Thermal comfort.
- Thermal labyrinths.
- Underfloor air conditioning at London Grade II listed landmark.
- Underfloor air distribution UFAD.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.
Accommodating the Victorian and Edwardian working woman. Book review.
Rethinking passive fire protection in design
PFP demands the same level of design rigour as structure or services.
38% of Gen Zs feel safe when a fire door is wedged open.
Stunning images from around the world
Shortlist for CIOB’s Art of Building photography competition.
Guidance for conversion of traditional pre-1919 stone buildings.
Industrial heritage in the Ruhr
A marked difference to the fate of industrial landscapes in the UK.
Communities will be able to build their own clean energy.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.