Plenum ventilation in buildings
Plenums are air compartments or chambers that are sometimes found in buildings, either above suspended ceilings, in the gap between the ceiling and the floor slab, or below raised floors in the gap between the raised floor and the floor slab. They form part of the ventilation system for the building.
They may be supply or return plenum, and may serve either an entire building, or a specific zone in a building. Supply plenum supply ventilation air to the occupied space, whilst return air is generally extracted through ductwork. Conversely, in return plenum the air is generally ducted to the space, whilst the return air is extracted through the plenum.
Plenum can be combined with thermal mass to help moderate peak conditions, or to allow night time purging. See thermal mass for more information.
Underfloor air distribution (UFAD) uses the underfloor plenum beneath a raised floor to provide ventilation air through floor diffusers directly to the occupied zone. The air spreads across the floor forming a reservoir of fresh, cool air. Any sources of heat (such as people or computers) generate a thermal plume lifting contaminated air to high level where it can be removed from the space. See Underfloor air distribution for more information.
Plenum can give good flexibility for the layout of buildings. However, they can provide a space within which fire can spread, particularly because of the air supply they offer, and so they may be required to include fire and smoke detection, and potentially combustible material (such as cables) may be controlled. They can also create a pathway for the transmission of sound between separate spaces.
The inclusion of dampers and acoustic attenuators can be beneficial, but this results in pressure losses. Good air-tightness is required to the plenum construction to optimise performance.
It is important to ensure that spaces above suspended ceilings and below raised floors do not inadvertently become plenum as a result of the disconnection of, or damage to ductwork.
NB the phrase ‘open plenum’ can be used to describe buildings in which there is no suspended ceiling, but instead the floor slab and services are exposed giving an ‘industrial’ look.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Active thermal mass.
- Air handling unit.
- Chilled beam.
- CIBSE Case Study Olympic Velodrome.
- CIBSE Case Study Ortus Learning and Events Centre.
- Ground preconditioning of supply air.
- Herringbone strut.
- HVAC.
- Floating floor.
- Floor plenum airtightness.
- Mechanical ventilation.
- Night time purging.
- Raised floor.
- Sprung floor.
- Suspended ceiling.
- Thermal labyrinth.
- Thermal mass.
- Underfloor air distribution
- Ventilation.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.