Underground car park
A car park is a designated area or building where cars and other vehicles can be parked and left temporarily. In American English, it is referred to as a ‘parking lot’. Car parks are a common feature of the built environment, and often adjoin shopping centres, public buildings, schools, sports or entertainment venues, and so on.
For more information, see Car park.
Underground car parks are parking facilities that are built beneath the ground, either in the basement of a building or beneath a street. The primary advantage to this type of car park is that it can be developed in high-density urban areas where street-level space is at a premium. It is also hidden from view, and can provide enhanced security and weather protection for vehicles. However, access to and from underground car parks can be complex, as can building services such as lighting and ventilation, and they are typically expensive to excavate and construct. Security and safety measures must also be in place to prevent unauthorised access, provide surveillance and to facilitate escape in the event of an emergency.
Underground car parks can be constructed using steel sheet piles as a retaining structure, and concrete floors can be designed to stabilise the finished structure.
[edit] Related articles on Designing Buildings
- Basement excavation.
- Car park.
- Integrated transport system.
- Multi-storey car park.
- Planning (Subterranean Development) Bill.
- Overview of the road development process.
- Road traffic management.
- Tired of the commute? It might be time to take cars underground.
- Traffic engineering.
- Transport design and health.
- Types of road and street.
- Underground.
- Underground space.
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
Comments
where is says "authorised access" i believe it should be "Unauthorised"
Fixed thanks