[edit] What is cost of quality (COQ)?
More accurately the question should be `What is the cost of poor quality?` or even `What is the cost of not getting it right first time?`. The principle of COQ is quite simple as it is often described by using the PAF(F) model (see below), ie the total cost of getting it right plus the additional costs of getting it wrong. The three main areas of the PAF model are:
- Failure: costs of defects whether we see them internally (eg cost of any reject products we make that we find ourselves) or externally (eg rejects that we have missed but has ended up with the customer)
- Appraisal: cost of measuring or monitoring (eg inspection of the product, auditing the process to make sure the system performs correctly)
- Prevention: cost of preventing defects (eg designing or planning to make it difficult to create defects); note: this is a positive cost which if implemented correctly will reduce the failure-cost reducing the total COQ.
Note: this is a very generic and simplified explanation of the costs required to be measured but it is important to get a visualisation of the process.
Measuring these costs is not so easy to do and requires a lot of effort but the benefits are considerable as this is the language of money - the language that the boardroom understands!
[edit] History of COQ
Dr Joseph Juran (one of the eminent quality management Gurus) introduced the concept of COQ in his `Quality Control Handbook` in the 1950s which has been developed over the years and was incorporated in the US MIL standards (Department of Defence) in 1963. Dr Armand Feigenbaum introduced the concept of the `hidden plant` in his book `Total Quality Control` in 1951 quoting a figure of 40% of the plant is wasted by not getting it right first time. The American Society for Quality (ASQ) published `Quality Costs - What and How` in 1967 and over the years ASQ has become the recognised authority for the use of quality cost systems.
[edit] PAF(F) model
The PAF(F) model stands for prevention, appraisal & failure (internal & external - hence the extra `F`) which are the main elements of breaking down COQ. Figure 1 attempts to identify some of the potential costs and categorises them in the PAF(F) model.
Figure 1 - Examples of PAF(F) costs
- Prevention costs are activities that are designed to prevent poor quality from arising in products (and services) so as you can imagine often these costs are realised early in the lifecycle of a project. These can include elements of risk management (FMEA, risk assessments, internal audits etc), planning activities, design (designing to reduce the potential for failure), supplier evaluation, ensuring suppliers have the capabilities to carry out the tasks and even internal audits used to identify concerns ready for mitigation before the process starts.
- Appraisal costs are activities that will be put in place to check or control the products and services, such as inspection, testing and internal audits (checking that processes and systems are still working), verifying and validating.
- Internal failure costs are caused by products (or services) not conforming to requirements before the customer receives delivery. Any process which does not achieve `right first time` can be deemed an internal failure cost such as the requirement to re-design, products that are scrapped or re-worked, downtime for machinery etc.
- External Failure costs are caused by issues caused internally that end up with external customer. These can include the cost of rework, replacement, time spent on customer complaints, reputation costs etc.
[edit] Benefits
The real aim of measuring these costs whether at project or business level is that you can identify what the main costs are and to determine opportunities for improvement. Figure 2 shows the model as to how the PAF(F) elements make up the total cost of quality, and that more is spent on failure costs than on prevention & appraisal.
Figure 2 – Model of current and future costs
CURRENT COSTS ------------------- FUTURE COSTS
Ideally the business wants to be able to spend more money on prevention to reduce the level of failure costs which will ultimately mean cost savings. This is a great opportunity for the quality team to `add value` to the business.
[edit] Practical Tips
- Measuring COQ for the whole business is not for the faint-hearted as determining all the costs requires input from many departments in the business
- Measuring COQ within a project is slightly easier but will need the whole team to be bought into the concept. Ideally the costs to measure will need to be identified before the project has started
- Don`t try to measure everything but choose costs which are likely to have an impact, but it is hugely important to measure the costs in a consistent way; eg measuring the cost of customer complaints using the same method at regular intervals
- Concentrate on measuring specific repeatable activities rather than `one-off` failures as these will generate long term savings that will last forever.
[edit] Useful Links
- https://asq.org/quality-resources/cost-of-quality - a couple of good videos on this page
- https://www.isixsigma.com/implementation/financial-analysis/cost-quality-not-only-failure-costs/
This article was originally written by Alan Grogan on behalf of the CQI Construction Special Interest Group, reviewed by Luca Fiderio and members of the Competency Working Group and approved for publication by the Steering Committee on 23 November 2019.
--ConSIG CWG 12:56, 15 Jan 2020 (BST)
[edit] Related articles on Designing Buildings Wiki
- CDM Regulations: a quality perspective
- Change control: a quality perspective
- Collaboration: a quality management perspective
- Design freeze: a quality perspective
- Design: a quality management perspective
- Digital quality management in construction
- Lifts and Escalators: A Quality Perspective
- Mobilisation to site: a quality perspective
- Quality culture and behaviours
- Quality manuals and quality plans
- Quality tools: fishbone diagram
- Stakeholder management: a quality perspective
- Structural steelwork: a quality perspective
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
Comments
I would also recommend the book Quality is Free by Philip Crosby.