Cost of quality (COQ)
Contents |
[edit] What is cost of quality (COQ)?
More accurately the question should be `What is the cost of poor quality?` or even `What is the cost of not getting it right first time?`. The principle of COQ is quite simple as it is often described by using the PAF(F) model (see below), ie the total cost of getting it right plus the additional costs of getting it wrong. The three main areas of the PAF model are:
- Failure: costs of defects whether we see them internally (eg cost of any reject products we make that we find ourselves) or externally (eg rejects that we have missed but has ended up with the customer)
- Appraisal: cost of measuring or monitoring (eg inspection of the product, auditing the process to make sure the system performs correctly)
- Prevention: cost of preventing defects (eg designing or planning to make it difficult to create defects); note: this is a positive cost which if implemented correctly will reduce the failure-cost reducing the total COQ.
Note: this is a very generic and simplified explanation of the costs required to be measured but it is important to get a visualisation of the process.
Measuring these costs is not so easy to do and requires a lot of effort but the benefits are considerable as this is the language of money - the language that the boardroom understands!
[edit] History of COQ
Dr Joseph Juran (one of the eminent quality management Gurus) introduced the concept of COQ in his `Quality Control Handbook` in the 1950s which has been developed over the years and was incorporated in the US MIL standards (Department of Defence) in 1963. Dr Armand Feigenbaum introduced the concept of the `hidden plant` in his book `Total Quality Control` in 1951 quoting a figure of 40% of the plant is wasted by not getting it right first time. The American Society for Quality (ASQ) published `Quality Costs - What and How` in 1967 and over the years ASQ has become the recognised authority for the use of quality cost systems.
[edit] PAF(F) model
The PAF(F) model stands for prevention, appraisal & failure (internal & external - hence the extra `F`) which are the main elements of breaking down COQ. Figure 1 attempts to identify some of the potential costs and categorises them in the PAF(F) model.
Figure 1 - Examples of PAF(F) costs
- Prevention costs are activities that are designed to prevent poor quality from arising in products (and services) so as you can imagine often these costs are realised early in the lifecycle of a project. These can include elements of risk management (FMEA, risk assessments, internal audits etc), planning activities, design (designing to reduce the potential for failure), supplier evaluation, ensuring suppliers have the capabilities to carry out the tasks and even internal audits used to identify concerns ready for mitigation before the process starts.
- Appraisal costs are activities that will be put in place to check or control the products and services, such as inspection, testing and internal audits (checking that processes and systems are still working), verifying and validating.
- Internal failure costs are caused by products (or services) not conforming to requirements before the customer receives delivery. Any process which does not achieve `right first time` can be deemed an internal failure cost such as the requirement to re-design, products that are scrapped or re-worked, downtime for machinery etc.
- External Failure costs are caused by issues caused internally that end up with external customer. These can include the cost of rework, replacement, time spent on customer complaints, reputation costs etc.
[edit] Benefits
The real aim of measuring these costs whether at project or business level is that you can identify what the main costs are and to determine opportunities for improvement. Figure 2 shows the model as to how the PAF(F) elements make up the total cost of quality, and that more is spent on failure costs than on prevention & appraisal.
Figure 2 – Model of current and future costs
CURRENT COSTS ------------------- FUTURE COSTS
Ideally the business wants to be able to spend more money on prevention to reduce the level of failure costs which will ultimately mean cost savings. This is a great opportunity for the quality team to `add value` to the business.
[edit] Practical Tips
- Measuring COQ for the whole business is not for the faint-hearted as determining all the costs requires input from many departments in the business
- Measuring COQ within a project is slightly easier but will need the whole team to be bought into the concept. Ideally the costs to measure will need to be identified before the project has started
- Don`t try to measure everything but choose costs which are likely to have an impact, but it is hugely important to measure the costs in a consistent way; eg measuring the cost of customer complaints using the same method at regular intervals
- Concentrate on measuring specific repeatable activities rather than `one-off` failures as these will generate long term savings that will last forever.
[edit] Useful Links
- https://asq.org/quality-resources/cost-of-quality - a couple of good videos on this page
- https://www.isixsigma.com/implementation/financial-analysis/cost-quality-not-only-failure-costs/
This article was originally written by Alan Grogan on behalf of the CQI Construction Special Interest Group, reviewed by Luca Fiderio and members of the Competency Working Group and approved for publication by the Steering Committee on 23 November 2019.
--ConSIG CWG 12:56, 15 Jan 2020 (BST)
[edit] Related articles on Designing Buildings Wiki
- CDM Regulations: a quality perspective
- Change control: a quality perspective
- Collaboration: a quality management perspective
- Design freeze: a quality perspective
- Design: a quality management perspective
- Digital quality management in construction
- Lifts and Escalators: A Quality Perspective
- Mobilisation to site: a quality perspective
- Quality culture and behaviours
- Quality manuals and quality plans
- Quality tools: fishbone diagram
- Stakeholder management: a quality perspective
- Structural steelwork: a quality perspective
Featured articles and news
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Building trust with customers through endorsed trades
Commitment to quality demonstrated through government endorsed scheme.
New guidance for preparing structural submissions for Gateways 2 and 3
Published by the The Institution of Structural Engineers.
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
Comments
I would also recommend the book Quality is Free by Philip Crosby.