Construction sites will generally require office facilities to provide accommodation for site managers, provide space for meetings and to provide storage for site documentation. Site offices are often described as ‘site huts’ even if they are large and well fitted out.
It is important that site offices are comfortable, attractive and versatile, as well as being suitably robust and secure. Regulation 17 of the Construction (Design and Management) Regulations 2015 (the CDM Regulations) states:
‘A construction site must, so far as is reasonably practicable, have sufficient working space and be arranged so that it is suitable for any person who is working or who is likely to work there, taking account of any necessary work equipment likely to be used there.’
Each individual project will have different requirements for site office provision. On large projects separate offices may be provided for site foremen, engineers and the commercial and project management team.
As site offices are generally temporary in nature, only there for the duration of the construction works, they are often prefabricated, or constructed from portable, or modular, buildings, frequently referred to as ‘portacabins’ (although 'Portkabin®' with a 'k' is a trade marked brand name of Portakabin Limited). These are standard sizes and can be fitted together or stacked to form almost any configuration of accommodation required. They can include reception spaces, offices, meeting rooms, kitchens, toilets, showers, changing facilities, lockers, storage, and so on.
Site offices are easily transported on flat-bed trucks and set up on site using a crane. Typically they have four adjustable steel legs with attachments for stacking. Site office panelling is usually made of galvanised steel sheet and a rigid insulation core. A plasterboard inner lining is used for walls and ceiling. Windows are often designed to optimise light levels, with white walls and heavy-duty flooring that is easy to clean. Several manufacturers provide anti-vandal protection, such as pyro-shield windows with steel shutters and high-security steel doors.
They are often stacked with external metal stairs leading to the second floor. Large sites may have several inter-linked portable offices capable of holding hundreds of people, stacked up to three-storeys high with internal stairs and steel frame bracing.
They may be purchased or rented, and once construction is complete, either returned or take to a new site for re-use.
[edit] Related articles on Designing Buildings Wiki
- Lighting of construction sites.
- Main construction compound.
- Materials on site.
- Mobilisation.
- Off site materials.
- Office.
- Office definition.
- Office manual.
- Office space planning.
- Pre construction information.
- Site layout plan.
- Site facilities.
- Site storage.
- Temporary site services.
- Welfare facilities.
- Workplace definition.
[edit] External references
- ‘Building Construction Handbook’ (6th ed.), CHUDLEY, R., GREENO, R., Butterworth-Heinemann (2007)
Featured articles and news
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..