Y:Cube development in Mitcham
On 8 September 2015, an innovative, factory-built affordable housing scheme in south west London welcomed its first tenants.
The 36-apartment Y:Cube development was designed as ‘move-on accommodation’ for single people leaving homelessness hostels and supported housing schemes. It was developed by the YMCA, the world’s oldest and largest youth charity and is located in Clay Avenue in Mitcham, south west London.
Y:Cube tenants will all have a local connection to the area. Half will be YMCA residents currently living in YMCA accommodation in South West London, and the other 50% will be nominations from Merton Council. Y:Cube Housing has an anticipated length of stay of three to five years.
Y:Cube was designed by renowned architecture practice Rogers Stirk Harbour + Partners (RSHP) and unveiled by the Minister of State for Housing and Planning, Brandon Lewis MP.
The apartments are rented out at 65% of the market rate for the area. This is possible because of the low cost of the development, achieved using off-site construction methods, which also meant that the build programme lasted just five months. The 36 Y:Cube units were built in Derbyshire before being transported to London. Construction on the three-storey site started in March and the last home was completed in August.
Y:Cube uses a pre-constructed modular system that enables units to stack on top or alongside each other, making it adaptable to the size and space available and well-suited to tight urban sites. Each unit is constructed from high-quality, environmentally-efficient materials (mainly renewable timber), creating accommodation that requires little or no heating, even in the winter.
The Y:Cube units are 26sqm studio-like apartments, for single occupancy. Each unit is constructed in the factory with all the services already incorporated. Water, heating and electricity can be connected to existing facilities or to other Y:Cubes already on site. Additional units can be added if needed and whole developments can be taken apart and rebuilt in new locations.
Along with investment from YMCA London South West, the Y:Cube development in Mitcham was funded with a grant of £337,000 from the Mayor of London’s Building the Pipeline scheme and ‘social investments’ from City Bridge Trust, Tudor Trust, Trust for London and Esmée Fairbairn Foundation. It was created in partnership with RSHP, project manager Aecom, and contractor SIG Plc Building Systems.
Wendy Omollo, 24, was one of the first Y:Cube tenants, having previously been homeless. She said: “By having my own space with my own front door I will regain my independence. But it’s not just that. As the rent is affordable and I can stay for up to five years, I’ll also be able to save money for a deposit. Basically, when the time comes to move on from Y:Cube, I will be in a far better situation than today.”
Richard James, Chief Executive of YMCA London South West, added: “Y:Cube presents a new way of creating genuinely affordable aspirational housing for single people in housing need. Great design and an innovative construction system have helped us in developing a housing scheme that challenges traditional housebuilding methods.”
Ivan Harbour, Senior Partner and Lead Architect for Y:Cube at RSHP, said: “Y:Cube offers generous space and exceptional insulation, daylight and acoustics. By delivering high-quality accommodation using quick and cost-effective volumetric technology, we hope to offer a new model for house building in the future.”
YMCA hopes to roll out other similar Y:Cube schemes across London and other parts of England in the near future.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).