Why hard copies of O&M manuals are obsolete
Contents |
[edit] Introduction
The building owner's manual, or operation and maintenance manual (O&M manual), contains the information required for the operation, maintenance, decommissioning and demolition of a building.
So, how many hard copies do you need?
The answer is none. In 2017, there are much more effective methods of delivery for structured data and O&M requirements.
Multiple hard copies are often a contractual requirement but this does not mean they shouldn’t be challenged. Here’s a typical example of the standard A37 specification within the Employers Information Requirements [EIRs]:
However, generally, when a client is informed of the problems associated with paper copies and the direct cost saving available by reducing them, it is often possible to eliminate hard copies entirely.
[edit] The problem with hard copies
Once a hard copy is delivered, it is rarely looked at and provides limited benefit to the end user.
Common problems associated with hard copy O&Ms:
- They are costly to produce.
- They quick to become out of date.
- They have significant storage requirements.
- They are susceptible to loss and damage.
- It can be difficult to locate information
[edit] Benefits of paperless alternatives
Delivering project data through the cloud has numerous benefits for the end user over traditional paper methods:
- Cost savings
- They are simple to navigate.
- Data is secure and backed up.
- They can be accessed anywhere at anytime.
- The ability to integrate with client systems.
[edit] Why not invest in hosting instead?
The cost saving from eliminating hard copies can be invested in services that may be more beneficial to end users such a hosting agreement, which provides:
- 24/7 access to real project data.
- Updates for future fit-out and alterations.
- On-going training and support for end users.
[edit] Or an enhanced asset register & PPM schedule
Often, when a building manager takes occupation, the first thing they do is procure an expensive manual survey to identify what plant they have inherited. This is because key asset data is buried within hundreds of pages of paper O&M manuals.
By investing in an on-line asset register and planned preventative maintenance schedule (PPM), building mangers can avoid this cost and plan for occupation well in advance.
Benefits include;
- Early availability of asset data.
- Day zero PPM.
- Mobilise staff and procure maintenance contracts.
- Integrate with existing CAFM systems.
--Createmaster 16:57, 12 Jun 2017 (BST)
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Building log book.
- Building owner's manual - O and M manual
- Building user's guide.
- Handover to client.
- Health and safety file.
- Maintenance.
- Operation and Maintenance Manuals - Cheap Options.
- Operation, maintenance and training (OMT).
- Practical completion.
- Preliminaries.
- Technical guide.
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.