Loss and damage in brief
Contents |
[edit] Introduction
The term loss and the term damage has very specific legal definitions in different circumstances, particularly in the construction industry. Internationally it is associated with loss or repairable damage that has been caused by the manifestations or impacts of climate change.
[edit] Construction contracts
Loss in the construction industry, generally relates to losses incurred by one or more parties to the construction contract, such as in the term loss and expense. Damages relating to a breach of contract are intended to be a measure of compensation relative to failure of contractual promises. The award of damages in respect of tortious liability is intended to place an innocent party back in the position they were before the breach of the duty, thus awards of damages for breach of contract may be greater than awards of damages in tort.
[edit] International negotiations
Internationally, loss and damage or (L&D) is a somewhat interpretable phrase but one that refers to permanent loss or repairable damage caused by the manifestations of climate change. Its use, definition and management is contentious; it may include extreme and sudden weather events, but also the slower onset of climatic change such as sea level rise or desertification. It can also be used in reference to both economic and non-economic loss, such as loss of life, ecosystem loss, loss of cultural heritage, or settlements.
[edit] Origins at the Conference of Parties (COP)
The joint term loss and damage was initially used during UN climate negotiations in the early 1990's when the Republic of Vanuatu, a small island country located in the South Pacific Ocean, proposed creating an insurance scheme for countries likely to be impacted by rising sea levels, later coming to be known as the Alliance of Small Island States (AOSIS).
In the 2009 COP in Copenhagen, developed countries agreed to mobilise $100 billion (€101bn) a year by 2020. COP 17 agreed to continue technical work under three thematic areas, and national and international approaches and mechanisms. At COP18 in 2012 parties acknowledged the necessity of strengthening institutional arrangements to address L&D in particularly vulnerable developing countries.
In 2013 at COP 19 the Warsaw International Mechanism (WIM) was established to “address loss and damage associated with impacts of climate change, including extreme events and slow onset events, in developing countries that are particularly vulnerable to the adverse effects of climate change” (Decision 2/CP.19). The levels and payments of compensation have continued to be a matter of contention throughout following COP meetings.
At COP26 in Glasgow, developing nations stated the fund should be paid by large emitters, in grants rather than loans and in 2021 Denmark and Scotland agreed to pay set amounts as part of the loss and damage mechanism. Indication from the UN emissions gap report found levels being paid were around 34 per cent of the total amount initially agreed in 2009.
In 2022 at the COP27 negotiations in Egypt, funding arrangements for loss and damage were included on the formal agenda, it continues to be a key issue to be resolved.
[edit] Related articles on Designing Buildings
- Damages in construction contracts.
- Loss in the construction industry.
- Climate change science.
- Climate adaptation.
- Adaptability.
- Building flood resilience.
- Business resilience.
- Hurricane design considerations.
- Risk assessment.
[edit] External references
- https://unfccc.int/topics/adaptation-and-resilience/the-big-picture/introduction-to-loss-and-damage
- A. DURAND, S. HUQ, “Defining Loss and Damage: Key Challenges and Considerations for Developing an Operational Definition”, International Centre for Climate Change and Development, 2014.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.


























Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.