Glass manifestation
Manifestation is a treatment that can be applied to glass windows, doors, partitions and any other large expanses of clear glass, in order to make the glass visible, preventing injury through collisions. It can also help enhance privacy and can be decorative.
Manifestation is typically created from a frosted film applied at specified locations on clear glass to make it more easy to detect.
Building regulations requirement K5.2: Manifestation of glazing, states that:
| Transparent glazing with which people are likely to come into contact while moving around in or about the building, shall incorporate features which make it apparent. |
Approved document K, Protection from falling, collision and impact, suggests that this requirement will be satisfied by including permanent means of indicating the presence of large uninterrupted areas of transparent glazing, and Section 7 of the approved document provides further details, requiring that either:
| They are clearly defined with glass manifestation on the glass at two levels; between 850-1,000 mm and 1,400-1,600 mm above the floor, contrasting visually with the background seen through the glass (both inside and out) in all lighting conditions. Manifestation takes the form of logo or sign at least 150 mm high (repeated if on a glazed screen), or a decorative feature such as broken lines or continuous bands, at least 50 mm high. |
The most simple manifestation is two rows of 50-75 mm white or frosted dots, however, the regulations do not dictate the appearance of the manifestation. Standard designs of dots, squares and simple bands are common, but large panels in etched or printed film with cut-out clear spaces, or branded manifestation with logos or other designs are also acceptable.
Alternative solutions such as mullions, transoms, door frames or large pull handles / push plates may also be acceptable.
In addition, doors should be apparent from the side, if they can be held open, and where glazed doors are beside a glazed screen, they should be marked with a high contrast strip along the top and at both sides.
The approved document to Part M of the Building Regulations - access to and use of buildings - states that people with visual impairment should be in no doubt as to the location of glass doors and screens, and steps should be taken to avoid people being harmed by walking into them. This requirement is satisfied if they comply with approved document K, section 7.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.



























Comments