Asset register for built assets
An asset register is a schedule of components that form part of a built asset such as a building. It may form part of a building owner's manual, (operation and maintenance manual or O&M manual) for a building which contains all the information required for the operation, maintenance, decommissioning and demolition of a building.
An asset register may be prepared for every component in a building, or just for the ‘active’ assets that require regular inspection, maintenance, cleaning or replacement, such as building services components.
Ideally, it should be prepared during the design stage, but it may be prepared during construction, or as part of a survey of a completed building. Software is available to help prepare and manage asset registers, and companies exist that will carry out an asset survey to compile an initial register.
An asset register may contain a wide range of information, such as:
- A description of the asset.
- Identification number.
- Location.
- Size.
- Access information.
- Supplier.
- Installer.
- Purchase price.
- Date of acquisition.
- Purchase order number.
- Date of delivery .
- Ownership records.
- Current value.
- Condition and defects.
- Maintenance requirements and intervals.
- Information about spares.
- Photographs.
- Drawing references.
- Running cost.
- Energy performance.
- Certification.
- Health and safety information.
- Service level agreements.
- Warranties.
- Disposal date.
- Method of disposal.
- Sale price.
An asset register can be useful for programming and providing the information necessary to carry out activities such as inspections, cleaning and planned preventative maintenance as well as for carrying out repairs or alterations. In addition, it can be useful for budgeting purposes, or for valuing assets, and a copy might be archived as part of an annual financial reporting process.
Asset registers will tend to be prepared digitally, will be searchable and include links to supporting documentation. They may be integrated with maintenance scheduling software, computer-aided facilities management (CAFM) software or building information models (BIM).
Increasingly, building information models (or asset information models) should include all the of information that previously might have been held on a separate asset register. An asset information model (AIM) is an operational BIM model that compiles the data and information necessary to support asset management, that is, it provides all the data and information related to, or required for the operation of an asset. The information required for an asset information model should be defined in the asset information requirements (AIR). In the case of a new asset, asset information requirements will have been used to develop the employer’s information requirements (EIR) incorporated into the tender documentation for a project.
Once compiled, it is very important that the asset register is kept up to date. Responsibility for maintaining the asset register may be given to an asset manager.
NB NRM3: Order of cost estimating and cost planning for building maintenance works, defines an asset register as: '...a record of applicable maintainable assets, including information such as constructed specification, operational performance data, financial and technical details about each asset.'
See also: Creating an asset register for construction projects.
[edit] Related articles on Designing Buildings
- Asset information model
- Asset information requirements.
- BIM and facilities management.
- BIM.
- Building owners manual.
- Contract register.
- Construction Operations Building Information Exchange (COBie).
- Creating an asset register for construction projects.
- Employers Information Requirements.
- NRM3.
- Service level agreement.
- Site records and registers.
- Types of register
Featured articles and news
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.