Asset register for built assets
An asset register is a schedule of components that form part of a built asset such as a building. It may form part of a building owner's manual, (operation and maintenance manual or O&M manual) for a building which contains all the information required for the operation, maintenance, decommissioning and demolition of a building.
An asset register may be prepared for every component in a building, or just for the ‘active’ assets that require regular inspection, maintenance, cleaning or replacement, such as building services components.
Ideally, it should be prepared during the design stage, but it may be prepared during construction, or as part of a survey of a completed building. Software is available to help prepare and manage asset registers, and companies exist that will carry out an asset survey to compile an initial register.
An asset register may contain a wide range of information, such as:
- A description of the asset.
- Identification number.
- Location.
- Size.
- Access information.
- Supplier.
- Installer.
- Purchase price.
- Date of acquisition.
- Purchase order number.
- Date of delivery .
- Ownership records.
- Current value.
- Condition and defects.
- Maintenance requirements and intervals.
- Information about spares.
- Photographs.
- Drawing references.
- Running cost.
- Energy performance.
- Certification.
- Health and safety information.
- Service level agreements.
- Warranties.
- Disposal date.
- Method of disposal.
- Sale price.
An asset register can be useful for programming and providing the information necessary to carry out activities such as inspections, cleaning and planned preventative maintenance as well as for carrying out repairs or alterations. In addition, it can be useful for budgeting purposes, or for valuing assets, and a copy might be archived as part of an annual financial reporting process.
Asset registers will tend to be prepared digitally, will be searchable and include links to supporting documentation. They may be integrated with maintenance scheduling software, computer-aided facilities management (CAFM) software or building information models (BIM).
Increasingly, building information models (or asset information models) should include all the of information that previously might have been held on a separate asset register. An asset information model (AIM) is an operational BIM model that compiles the data and information necessary to support asset management, that is, it provides all the data and information related to, or required for the operation of an asset. The information required for an asset information model should be defined in the asset information requirements (AIR). In the case of a new asset, asset information requirements will have been used to develop the employer’s information requirements (EIR) incorporated into the tender documentation for a project.
Once compiled, it is very important that the asset register is kept up to date. Responsibility for maintaining the asset register may be given to an asset manager.
NB NRM3: Order of cost estimating and cost planning for building maintenance works, defines an asset register as: '...a record of applicable maintainable assets, including information such as constructed specification, operational performance data, financial and technical details about each asset.'
See also: Creating an asset register for construction projects.
[edit] Related articles on Designing Buildings
- Asset information model
- Asset information requirements.
- BIM and facilities management.
- BIM.
- Building owners manual.
- Contract register.
- Construction Operations Building Information Exchange (COBie).
- Creating an asset register for construction projects.
- Employers Information Requirements.
- NRM3.
- Service level agreement.
- Site records and registers.
- Types of register
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.






















