Why hard copies of O&M manuals are obsolete
Contents |
[edit] Introduction
The building owner's manual, or operation and maintenance manual (O&M manual), contains the information required for the operation, maintenance, decommissioning and demolition of a building.
So, how many hard copies do you need?
The answer is none. In 2017, there are much more effective methods of delivery for structured data and O&M requirements.
Multiple hard copies are often a contractual requirement but this does not mean they shouldn’t be challenged. Here’s a typical example of the standard A37 specification within the Employers Information Requirements [EIRs]:
However, generally, when a client is informed of the problems associated with paper copies and the direct cost saving available by reducing them, it is often possible to eliminate hard copies entirely.
[edit] The problem with hard copies
Once a hard copy is delivered, it is rarely looked at and provides limited benefit to the end user.
Common problems associated with hard copy O&Ms:
- They are costly to produce.
- They quick to become out of date.
- They have significant storage requirements.
- They are susceptible to loss and damage.
- It can be difficult to locate information
[edit] Benefits of paperless alternatives
Delivering project data through the cloud has numerous benefits for the end user over traditional paper methods:
- Cost savings
- They are simple to navigate.
- Data is secure and backed up.
- They can be accessed anywhere at anytime.
- The ability to integrate with client systems.
[edit] Why not invest in hosting instead?
The cost saving from eliminating hard copies can be invested in services that may be more beneficial to end users such a hosting agreement, which provides:
- 24/7 access to real project data.
- Updates for future fit-out and alterations.
- On-going training and support for end users.
[edit] Or an enhanced asset register & PPM schedule
Often, when a building manager takes occupation, the first thing they do is procure an expensive manual survey to identify what plant they have inherited. This is because key asset data is buried within hundreds of pages of paper O&M manuals.
By investing in an on-line asset register and planned preventative maintenance schedule (PPM), building mangers can avoid this cost and plan for occupation well in advance.
Benefits include;
- Early availability of asset data.
- Day zero PPM.
- Mobilise staff and procure maintenance contracts.
- Integrate with existing CAFM systems.
--Createmaster 16:57, 12 Jun 2017 (BST)
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Building log book.
- Building owner's manual - O and M manual
- Building user's guide.
- Handover to client.
- Health and safety file.
- Maintenance.
- Operation and Maintenance Manuals - Cheap Options.
- Operation, maintenance and training (OMT).
- Practical completion.
- Preliminaries.
- Technical guide.
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.