Project quality plan PQP
The term 'quality assurance' describes a set of planned, systematic actions to ensure that products and services comply with specified requirements. It not only involves checking the final quality of products to avoid defects, as is the case in quality control, but also checking product quality in a planned way through all the production stages. It is the development of work and product design procedures to prevent errors from occurring in the first place, based on planning, backed up by quality manuals and tools.
A project quality plan (PQP), sometimes referred to as a quality management plan, quality assurance plan or project quality management plan, is a project-specific quality plan that describes the activities, standards, tools and processes necessary to achieve quality in the delivery of a project.
It is sometimes considered to be interchangeable with the project execution plan (PEP) which sets out the overall strategy for managing the project, describing who does what and how, and defining the policies, procedures and priorities that will be adopted.
RIBA suggest that the PEP or PQP helps track and control projects which can progress erratically and intermittently and should pass the ‘what happens if ‘Fred’ is knocked-down by a bus’ test, describing the project and processes in such a way that competent people could take over the project and maintain the program, service and performance.
However, on large projects, the project execution plan might be an overarching document that includes (or references) a number of more detailed plans focusing on specific issues such as; the project quality plan, health and safety plan, risk management plan, value management plan, stakeholder management plan, and so on.
For more information, see Project Execution Plan.
The project quality plan should:
- Provide explanatory text describing the nature of the project and the quality expectations.
- Set out the organisations quality policies (for example, if they are ISO 9001 certified) and how these policies will apply to the project.
- Identify other quality criteria or policies that may need to be followed, such as the requirements of clients or funders.
- Describe how quality requirements will cascade down through the supply chain.
- Describe the activities necessary to deliver the project and the order in which they will be carried out.
- Describe the resources required.
- Set out quality roles and responsibilities.
- Identify the standards that will apply.
- Describe monitoring and reporting procedures and the process for delivering continuous improvement.
- Describe procedures for dealing with defects.
- Describe document control procedures.
- Describe change control procedures.
- Set out any training requirements.
- Schedule tools that will be used.
- List reference material.
Some of these elements may be common to all projects, however, the PQP should not duplicate information that is available elsewhere (but rather should reference it), and it should be project specific, rather than an a generic box-ticking exercise.
[edit] Related articles
- BIM Execution Plan.
- Briefing documents.
- Collaborative practices.
- Change control procedure.
- Construction quality.
- Design quality.
- Document control.
- Project implementation plan (for BIM).
- Quality control.
- Quality in construction projects.
- Quality management systems (QMS) - beyond the documentation.
- Quality manuals and quality plans.
- Record keeping.
- Schedule of services.
- Site inspection.
- Site inspector.
- Total quality management in construction.
- Value management.
- Workmanship.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.

























Comments