Ska rating for non-domestic fit outs
Contents |
[edit] Introduction
Ska Rating is a Royal Institute of Chartered Surveyors (RICS) environmental assessment method, benchmark and standard for non-domestic fit outs. It helps landlords and tenants assess fit out projects against a set of sustainability good practice criteria, known as Good Practice Measures (GPM).
Previously, although there were established tools for assessing the environmental impact of whole buildings (such as BREEAM in the UK and LEED in the US), industry feedback about the certification of fit out, especially on existing buildings, indicated that attempts to use whole building systems were unsatisfactory both in terms of high costs and low relevance.
Ska Rating was developed with designers, contractors, corporate occupiers, managing agents and consultants. The initial research project was started in 2005 by the fit out and refurbishment contractor Skansen (giving Ska it’s name) but was taken over by the RICS in 2009.
It differs from other labelling systems in that it is:
- Project driven: it labels fit out projects irrespective of the base building.
- A free online tool to help organisations achieve more sustainable fit outs (businesses only pay if they want formal certification).
- Flexible scoping: the tool measures only what is within the specific project’s scope.
[edit] Measures in scope
Ska comprises over 100 GPM’s, covering energy and CO2, waste, water, pollution, transport, materials and wellbeing. Each good practice measure is outlined in a data sheet explaining the criteria that need to be achieved, including the rationale behind the measure and guidance on how to achieve it.
Because each fit out project is unique in terms of the employers' requirements, the building, site or scope of works, Ska Rating scores the project only on the basis of those measures that are relevant to the project. These are called 'measures in scope'. Typically, between 30 and 60 measures are likely to apply to most projects. The score is ranked in three thresholds: Bronze, Silver and Gold. These thresholds are reached by achieving 75%, 50% or 25%, respectively of the measures in scope, which must include GPM’s from a pool of gateway measures.
[edit] What are 'gateway measures'?
Some measures are more important from a sustainability perspective, so the measures are ranked from 1 to 104, (1 is the highest and 104 the lowest). To ensure that teams do not just target the easiest measures, the project has to achieve a number of the highest ranked measures in scope in order to score. These are known as gateway measures.
[edit] How do you get an assessment undertaken?
Anyone can use the free online Ska Rating tool to informally evaluate a project. Professional certification can be achieved by engaging a Ska assessor to rate and certify the project. RICS operates an accreditation scheme to enable qualified professionals to undertake Ska rating assessments on behalf of organisations and a list of assessors can be found on the RICS website. RICS charges £60 for each certification the assessors carry out. The assessor typically charges £2,000-£3,000 per certification, depending on the nature and complexity of the project.
[edit] How is an assessment carried out?
The Ska assessment process is broken into three stages, with a certificate issued at completion of the project.
[edit] Design/planning
At this stage the measures and issues are identified. The client then has the opportunity to prioritise which measures they want to achieve and make decisions in relation to design, cost, programme and benefit. This will set the environmental performance standards for how the project is delivered in terms of waste, energy in use, etc. Then, if the specification demonstrates that these measures are likely to be achieved, they will be reflected in an indicative rating.
[edit] Handover
This involves gathering evidence from Operations and Maintenance (O&M) manuals and other sources to prove that what was specified has actually been delivered, and that the performance and waste benchmarks have been achieved.
[edit] Occupancy
Finally, there is the option to review how well the fit out has performed in use against its original brief from a year after completion.
[edit] How long does certification take?
Certification is a quick process. Once the handover stage has been assessed by an accredited assessor and the supporting information has been added to the online tool, the certificate is automatically produced so it can be issued to the client (at the same time the certificate is automatically lodged with the RICS).
[edit] Key aspects of the rating system
- Flexible scoping: match the rating to the scope of the fit out.
- Easy-to-use online tool.
- A label that is clear and easy to understand: bronze, silver and gold.
- Formal quality assured scheme for those who require a certificate.
- Applicable to offices and retail fit outs.
- Access to lease funding for the project.
[edit] Related articles
- BREEAM.
- Code for Sustainable Homes.
- Common Minimum Standards.
- Government Construction Strategy.
- Key performance indicators.
- Leadership in Energy and Environmental Design.
- National Planning Policy Framework.
- Operations and maintenance manual.
- Passivhaus.
- Performance in use.
- Post occupancy evaluation.
- Sustainability.
- Whole-life costs
[edit] External references
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.