Site appraisal for construction
Very early appraisals of potential sites for a development may be carried out by a surveyor, before the appointment of the consultant team, during the business justification stage. Appraisal of alternative sites may also be an important part of an environmental impact assessment.
Subsequent site appraisals by the consultant team will obtain details that might not have been available in the site Information provided by the client. They are also an opportunity for the consultant team to familiarise themselves with the site and assess the detailed surveys that might be necessary.
Specific appraisals that might be made by individual consultants include:
- Architect:
- Desktop study of site history.
- Study of site context including access, boundaries, levels, landscape (including possible ecological issues such as the presence of japanese knotweed), transport and traffic and an assessment of neighbouring properties and views.
- Appraisal of possible hazardous substances such as asbestos and other deleterious materials.
- Photographic studies.
- Assessment of the local planning authority's local development plan.
- Climatic conditions.
- Cost consultant:
- Structural engineer:
- Desktop study of geological issues or contaminated land.
- Cursory study of neighbouring or existing structures that might require demolition or might otherwise be impacted by development.
- Desktop study of foundation solutions adopted by adjacent developments.
- Services engineer:
- Location and nature of underground site services.
- Cursory investigation to establish 'cut off' for diversions of existing services.
- Statutory utility drawings for the site.
[edit] Related articles on Designing Buildings
- Alternative site assessment ASA.
- Building People.
- Building survey.
- Conceptual site model.
- Condition.
- Condition survey.
- Contaminated land.
- Demolition.
- Desk study.
- Development appraisal.
- Difference between existing use value and market value.
- Environmental Impact Assessment.
- Feasibility studies.
- Gross development value.
- Ground conditions.
- Insitu testing of soils.
- Laser scanning.
- Property valuation.
- Radon.
- Radon protection for new domestic extensions and conservatories with solid concrete ground floors (GG 73 revised).
- Site information.
- Site investigation.
- Site selection and acquisition.
- Site surveys.
- Soil survey.
- Surveyor.
- Technical due diligence.
- Vendor survey.
Featured articles and news
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherit assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.


















Comments